These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

149 related articles for article (PubMed ID: 11443963)

  • 1. Experimental considerations on monitoring ORP, pH, conductivity and dissolved oxygen in nitrogen and phosphorus biological removal processes.
    Spagni A; Buday J; Ratini P; Bortone G
    Water Sci Technol; 2001; 43(11):197-204. PubMed ID: 11443963
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Correlating on-line monitoring parameters, pH, DO and ORP with nutrient removal in an intermittent cyclic process bioreactor system.
    Tanwar P; Nandy T; Ukey P; Manekar P
    Bioresour Technol; 2008 Nov; 99(16):7630-5. PubMed ID: 18358714
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Online estimation of wastewater nitrifiable nitrogen, nitrification and denitrification rates, using ORP and DO dynamics.
    Spérandio M; Queinnec I
    Water Sci Technol; 2004; 49(1):31-8. PubMed ID: 14979535
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Effect of pH on biological phosphorus uptake.
    Serralta J; Ferrer J; Borrás L; Seco A
    Biotechnol Bioeng; 2006 Dec; 95(5):875-82. PubMed ID: 16958137
    [TBL] [Abstract][Full Text] [Related]  

  • 5. NOx monitoring of a simultaneous nitrifying-denitrifying (SND) activated sludge plant at different oxidation reduction potentials.
    Weissenbacher N; Loderer C; Lenz K; Mahnik SN; Wett B; Fuerhacker M
    Water Res; 2007 Jan; 41(2):397-405. PubMed ID: 17166541
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Monitoring pH and electric conductivity in an EBPR sequencing batch reactor.
    Serralta J; Borrás L; Blanco C; Barat R; Seco A
    Water Sci Technol; 2004; 50(10):145-52. PubMed ID: 15656307
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Evaluation of a novel oxidation ditch system for biological nitrogen and phosphorus removal from domestic sewage.
    Chen X; Fujiwara T; Ohtoshi K; Inamori S; Nakamachi K; Tsuno H
    Water Sci Technol; 2010; 62(8):1745-54. PubMed ID: 20962389
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Effect of dissolved oxygen on nitrogen removal and process control in aerobic granular sludge reactor.
    Yuan X; Gao D
    J Hazard Mater; 2010 Jun; 178(1-3):1041-5. PubMed ID: 20219282
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Soft sensors for control of nitrogen and phosphorus removal from wastewaters by neural networks.
    Luccarini L; Porrà E; Spagni A; Ratini P; Grilli S; Longhi S; Bortone G
    Water Sci Technol; 2002; 45(4-5):101-7. PubMed ID: 11936622
    [TBL] [Abstract][Full Text] [Related]  

  • 10. A novel wastewater treatment process: simultaneous nitrification, denitrification and phosphorus removal.
    Zeng RJ; Lemaire R; Yuan Z; Keller J
    Water Sci Technol; 2004; 50(10):163-70. PubMed ID: 15656309
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Low cost-sensors as a real alternative to on-line nitrogen analysers in continuous systems.
    Ruano MV; Ribes J; Seco A; Ferrer J
    Water Sci Technol; 2009; 60(12):3261-8. PubMed ID: 19955651
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Real-time control strategy for simultaneous nitrogen and phosphorus removal using aerobic granular sludge.
    Kishida N; Tsuneda S; Sakakibara Y; Kim JH; Sudo R
    Water Sci Technol; 2008; 58(2):445-50. PubMed ID: 18701799
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Evaluation of sequencing batch reactor (SBR) and sequencing batch biofilm reactor (SBBR) for biological nutrient removal from simulated wastewater containing glucose as carbon source.
    Kumar BM; Chaudhari S
    Water Sci Technol; 2003; 48(3):73-9. PubMed ID: 14518857
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Optimum operation conditions of nitrogen and phosphorus removal by a biofilm-activated-sludge system.
    Liu JX; van Groenestijn JW
    J Environ Sci (China); 2003 Jan; 15(1):25-30. PubMed ID: 12602598
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Effect of prefermentation on denitrifying phosphorus removal in slaughterhouse wastewater.
    Merzouki M; Bernet N; Delgenès JP; Benlemlih M
    Bioresour Technol; 2005 Aug; 96(12):1317-22. PubMed ID: 15792577
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Effect of feed characteristics on the organic matter, nitrogen and phosphorus removal in an activated sludge system treating piggery slurry.
    González C; García PA; Muñoz R
    Water Sci Technol; 2009; 60(8):2145-52. PubMed ID: 19844061
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Mass balance of nitrogen, and estimates of COD, nitrogen and phosphorus used in microbial synthesis as a function of sludge retention time in a sequencing batch reactor system.
    Lee JK; Choi CK; Lee KH; Yim SB
    Bioresour Technol; 2008 Nov; 99(16):7788-96. PubMed ID: 18325762
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Nitrogen fixation in the activated sludge treatment of thermomechanical pulping wastewater: effect of dissolved oxygen.
    Slade AH; Anderson SM; Evans BG
    Water Sci Technol; 2003; 48(8):1-8. PubMed ID: 14682564
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Simultaneous nitrification, denitrification, and phosphorus removal in a lab-scale sequencing batch reactor.
    Zeng RJ; Lemaire R; Yuan Z; Keller J
    Biotechnol Bioeng; 2003 Oct; 84(2):170-8. PubMed ID: 12966573
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Automatic control strategy for biological nitrogen removal of low C/N wastewater in a sequencing batch reactor.
    Kishida N; Kim JH; Chen M; Tsuneda S; Sasaki H; Sudo R
    Water Sci Technol; 2004; 50(10):45-50. PubMed ID: 15656294
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 8.