245 related articles for article (PubMed ID: 16944209)
1. Kinetics of nitrogen removal from sanitary landfill leachate.
Kaczorek K; Ledakowicz S
Bioprocess Biosyst Eng; 2006 Dec; 29(5-6):291-304. PubMed ID: 16944209
[TBL] [Abstract][Full Text] [Related]
2. Nitrogen removal from landfill leachate via ex situ nitrification and sequential in situ denitrification.
Zhong Q; Li D; Tao Y; Wang X; He X; Zhang J; Zhang J; Guo W; Wang L
Waste Manag; 2009 Apr; 29(4):1347-53. PubMed ID: 19087900
[TBL] [Abstract][Full Text] [Related]
3. Simultaneous estimation of sludge biological activity and influent nitrogen load using ORP and DO dynamics.
Queinnec I; Spérandio M
Bioprocess Biosyst Eng; 2005 Aug; 27(5):329-37. PubMed ID: 15986213
[TBL] [Abstract][Full Text] [Related]
4. Nitrogen removal during leachate treatment: comparison of simple and sophisticated systems.
Vasel JL; Jupsin H; Annachhatre AP
Water Sci Technol; 2004; 50(6):45-52. PubMed ID: 15536989
[TBL] [Abstract][Full Text] [Related]
5. Optimization aspects of the biological nitrogen removal process in a full-scale twin sequencing batch reactor (SBR) system in series treating landfill leachate.
Remmas N; Ntougias S; Chatzopoulou M; Melidis P
J Environ Sci Health A Tox Hazard Subst Environ Eng; 2018 Jul; 53(9):847-853. PubMed ID: 29596027
[TBL] [Abstract][Full Text] [Related]
6. Kinetic model for biological nitrogen removal using shortcut nitrification-denitrification process in sequencing batch reactor.
Gao D; Peng Y; Wu WM
Environ Sci Technol; 2010 Jul; 44(13):5015-21. PubMed ID: 20540490
[TBL] [Abstract][Full Text] [Related]
7. Comparison of biological removal via nitrite with real-time control using aerobic granular sludge and flocculent activated sludge.
Gao D; Yuan X; Liang H; Wu WM
Appl Microbiol Biotechnol; 2011 Mar; 89(5):1645-52. PubMed ID: 20972676
[TBL] [Abstract][Full Text] [Related]
8. Design strategy for a simultaneous nitrification/denitrification of a slaughterhouse wastewater in a Sequencing Batch Reactor: ASM2d modeling and verification.
Filali-Meknassi Y; Auriol M; Tyagi RD; Comeau Y; Surampalli RY
Environ Technol; 2005 Oct; 26(10):1081-100. PubMed ID: 16342532
[TBL] [Abstract][Full Text] [Related]
9. Nitrogen removal from wastewater using simultaneous nitrate reduction and anaerobic ammonium oxidation in single reactor.
Sumino T; Isaka K; Ikuta H; Saiki Y; Yokota T
J Biosci Bioeng; 2006 Oct; 102(4):346-51. PubMed ID: 17116583
[TBL] [Abstract][Full Text] [Related]
10. Nitrogen removal via nitrite in a sequencing batch reactor treating sanitary landfill leachate.
Spagni A; Marsili-Libelli S
Bioresour Technol; 2009 Jan; 100(2):609-14. PubMed ID: 18707876
[TBL] [Abstract][Full Text] [Related]
11. Kinetic model of a granular sludge SBR: influences on nutrient removal.
de Kreuk MK; Picioreanu C; Hosseini M; Xavier JB; van Loosdrecht MC
Biotechnol Bioeng; 2007 Jul; 97(4):801-15. PubMed ID: 17177197
[TBL] [Abstract][Full Text] [Related]
12. Effect of temperature on AOB activity of a partial nitritation SBR treating landfill leachate with extremely high nitrogen concentration.
Gabarró J; Ganigué R; Gich F; Ruscalleda M; Balaguer MD; Colprim J
Bioresour Technol; 2012 Dec; 126():283-9. PubMed ID: 23079415
[TBL] [Abstract][Full Text] [Related]
13. Nitrogen removal from recycled landfill leachate by ex situ nitrification and in situ denitrification.
He PJ; Shao LM; Guo HD; Li GJ; Lee DJ
Waste Manag; 2006; 26(8):838-45. PubMed ID: 16459070
[TBL] [Abstract][Full Text] [Related]
14. Model-based process analysis of partial nitrification efficiency under dynamic nitrogen loading.
Güven D; Kutlu O; Insel G; Sözen S
Bioprocess Biosyst Eng; 2009 Aug; 32(5):655-61. PubMed ID: 19115066
[TBL] [Abstract][Full Text] [Related]
15. Impacts of aeration and active sludge addition on leachate recirculation bioreactor.
Jun D; Yongsheng Z; Henry RK; Mei H
J Hazard Mater; 2007 Aug; 147(1-2):240-8. PubMed ID: 17258391
[TBL] [Abstract][Full Text] [Related]
16. The effect of dissolved oxygen on PHB accumulation in activated sludge cultures.
Third KA; Newland M; Cord-Ruwisch R
Biotechnol Bioeng; 2003 Apr; 82(2):238-50. PubMed ID: 12584766
[TBL] [Abstract][Full Text] [Related]
17. Nitrogen removal from sludge water with SBR process: start-up of a full-scale plant in the municipal wastewater treatment plant at Ingolstadt, Germany.
Vallés-Morales MJ; Mendoza-Roca JA; Bes-Piá A; Iborra-Clar A
Water Sci Technol; 2004; 50(10):51-8. PubMed ID: 15656295
[TBL] [Abstract][Full Text] [Related]
18. Simulation modeling for nitrogen removal and experimental estimation of mass fractions of microbial groups in single-sludge system.
Huang JS; Tsai CC; Chou HH; Ting WH
Chemosphere; 2006 Jan; 62(1):61-70. PubMed ID: 15936800
[TBL] [Abstract][Full Text] [Related]
19. SBR technology for high ammonium loading rates.
Galí A; Dosta J; López-Palau S; Mata-Alvarez J
Water Sci Technol; 2008; 58(2):467-72. PubMed ID: 18701802
[TBL] [Abstract][Full Text] [Related]
20. Optimisation of nitrification-denitrification process in a sbr for the treatment of reject water via nitrite.
Galí A; Dosta J; Mata-Alvarez J
Environ Technol; 2007 May; 28(5):565-71. PubMed ID: 17615965
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]