These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

163 related articles for article (PubMed ID: 17891950)

  • 21. Development of a horizontal subsurface flow modular constructed wetland for urban runoff treatment.
    Choi JY; Maniquiz MC; Geronimo FK; Lee SY; Lee BS; Kim LH
    Water Sci Technol; 2012; 66(9):1950-7. PubMed ID: 22925868
    [TBL] [Abstract][Full Text] [Related]  

  • 22. Nutrient removal and plant biomass in a subsurface flow constructed wetland in Brisbane, Australia.
    Browning K; Greenway M
    Water Sci Technol; 2003; 48(5):183-9. PubMed ID: 14621163
    [TBL] [Abstract][Full Text] [Related]  

  • 23. [Application of two stage subsurface constructed wetland technology in cold area of northeast China].
    Hai RT; Fan LW; Xie T; Zhang Q; Zhuo F; Lin AJ
    Huan Jing Ke Xue; 2007 Nov; 28(11):2442-7. PubMed ID: 18290462
    [TBL] [Abstract][Full Text] [Related]  

  • 24. [Studies on nitrogen and phosphorus enhancing removal in combined shale and steel slag subsurface constructed wetlands].
    Tan HX; Zhou Q; Yang DH
    Huan Jing Ke Xue; 2006 Nov; 27(11):2182-7. PubMed ID: 17326423
    [TBL] [Abstract][Full Text] [Related]  

  • 25. [Effect of constructed wetland on the purification of industrial zone rainfall runoff contaminated with phenanthrene].
    Jing DD; Wan JQ; Ma YW; Li DY; Wang Y; Huang MZ
    Huan Jing Ke Xue; 2013 Aug; 34(8):3095-101. PubMed ID: 24191553
    [TBL] [Abstract][Full Text] [Related]  

  • 26. Nitrogen and phosphorus removal from plant nursery runoff in vegetated and unvegetated subsurface flow wetlands.
    Huett DO; Morris SG; Smith G; Hunt N
    Water Res; 2005 Sep; 39(14):3259-72. PubMed ID: 16023175
    [TBL] [Abstract][Full Text] [Related]  

  • 27. Emerging organic contaminant removal depending on primary treatment and operational strategy in horizontal subsurface flow constructed wetlands: influence of redox.
    Avila C; Reyes C; Bayona JM; García J
    Water Res; 2013 Jan; 47(1):315-25. PubMed ID: 23123085
    [TBL] [Abstract][Full Text] [Related]  

  • 28. Phosphorus removal in laboratory-scale unvegetated vertical subsurface flow constructed wetland systems using alum sludge as main substrate.
    Babatunde AO; Zhao YQ
    Water Sci Technol; 2009; 60(2):483-9. PubMed ID: 19633391
    [TBL] [Abstract][Full Text] [Related]  

  • 29. Treatment of landfill leachate using an aerated, horizontal subsurface-flow constructed wetland.
    Nivala J; Hoos MB; Cross C; Wallace S; Parkin G
    Sci Total Environ; 2007 Jul; 380(1-3):19-27. PubMed ID: 17241653
    [TBL] [Abstract][Full Text] [Related]  

  • 30. Basic Oxygen Furnace steel slag aggregates for phosphorus treatment. Evaluation of its potential use as a substrate in constructed wetlands.
    Blanco I; Molle P; Sáenz de Miera LE; Ansola G
    Water Res; 2016 Feb; 89():355-65. PubMed ID: 26722756
    [TBL] [Abstract][Full Text] [Related]  

  • 31. Treatment of laboratory wastewater in a tropical constructed wetland comparing surface and subsurface flow.
    Meutia AA
    Water Sci Technol; 2001; 44(11-12):499-506. PubMed ID: 11804141
    [TBL] [Abstract][Full Text] [Related]  

  • 32. Comparison between polishing (maturation) ponds and subsurface flow constructed wetlands (planted and unplanted) for the post-treatment of the effluent from UASB reactors.
    von Sperling M; Dornelas FL; Assunção FA; de Paoli AC; Mabub MO
    Water Sci Technol; 2010; 61(5):1201-9. PubMed ID: 20220242
    [TBL] [Abstract][Full Text] [Related]  

  • 33. A new operation mode solving clogging problems of horizontal subsurface constructed wetlands.
    Shen C; Yang D; Dong B
    Water Sci Technol; 2010; 62(5):1045-51. PubMed ID: 20818044
    [TBL] [Abstract][Full Text] [Related]  

  • 34. Performance of a subsurface-flow constructed wetland in southern China.
    Shi L; Wang BZ; Cao XD; Wang J; Lei ZH; Wang ZR; Liu ZY; Lu BN
    J Environ Sci (China); 2004; 16(3):476-81. PubMed ID: 15272727
    [TBL] [Abstract][Full Text] [Related]  

  • 35. Performance of a half-saturated vertical flow wetland packed with volcanic gravel in stormwater treatment.
    Chen Y; Park K; Niu S; Kim Y
    Water Sci Technol; 2014; 69(11):2331-8. PubMed ID: 24901629
    [TBL] [Abstract][Full Text] [Related]  

  • 36. Effects of intermittent loading on nitrogen removal in horizontal subsurface flow wetlands.
    Forbes MG; Yelderman JC; Potterton T; Doyle RD
    Water Sci Technol; 2010; 62(8):1865-71. PubMed ID: 20962402
    [TBL] [Abstract][Full Text] [Related]  

  • 37. Enhanced P, N and C removal from domestic wastewater using constructed wetland employing construction solid waste (CSW) as main substrate.
    Yang Y; Wang ZM; Liu C; Guo XC
    Water Sci Technol; 2012; 66(5):1022-8. PubMed ID: 22797230
    [TBL] [Abstract][Full Text] [Related]  

  • 38. [Intensity of nitrification and denitrification in subsurface-flow constructed wetlands].
    Huang J; Wang SH; Yan L; Liu Y; Wang F
    Huan Jing Ke Xue; 2007 Sep; 28(9):1965-9. PubMed ID: 17990540
    [TBL] [Abstract][Full Text] [Related]  

  • 39. Microbial mechanisms of carbon removal in subsurface flow wetlands.
    Baptista JD; Donnelly T; Rayne D; Davenport RJ
    Water Sci Technol; 2003; 48(5):127-34. PubMed ID: 14621156
    [TBL] [Abstract][Full Text] [Related]  

  • 40. Enhancing the removal of arsenic, boron and heavy metals in subsurface flow constructed wetlands using different supporting media.
    Allende KL; Fletcher TD; Sun G
    Water Sci Technol; 2011; 63(11):2612-8. PubMed ID: 22049756
    [TBL] [Abstract][Full Text] [Related]  

    [Previous]   [Next]    [New Search]
    of 9.