These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

67 related articles for article (PubMed ID: 18610543)

  • 1. Detection and prevention of enhanced biological phosphorus removal deterioration caused by Zoogloea overabundance.
    Montoya T; Borrás L; Aguado D; Ferrer J; Seco A
    Environ Technol; 2008 Jan; 29(1):35-42. PubMed ID: 18610543
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Upflow anaerobic sludge blanket reactor--a review.
    Bal AS; Dhagat NN
    Indian J Environ Health; 2001 Apr; 43(2):1-82. PubMed ID: 12397675
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Nutrient removal, microbial community and sludge settlement in anaerobic/aerobic sequencing batch reactors without enhanced biological phosphorus removal.
    Wu G; Rodgers M
    Water Sci Technol; 2010; 61(10):2433-41. PubMed ID: 20453315
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Acetate injection into anaerobic settled sludge for biological P-removal in an intermittently aerated reactor.
    Ahn KH; Yoo H; Lee JW; Maeng SK; Park KY; Song KG
    Water Sci Technol; 2001; 44(1):77-85. PubMed ID: 11496681
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Improved biological phosphorus removal performance driven by the aerobic/extended-idle regime with propionate as the sole carbon source.
    Wang D; Li X; Yang Q; Zheng W; Wu Y; Zeng T; Zeng G
    Water Res; 2012 Aug; 46(12):3868-78. PubMed ID: 22609408
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Real-time control strategy for simultaneous nitrogen and phosphorus removal using aerobic granular sludge.
    Kishida N; Tsuneda S; Sakakibara Y; Kim JH; Sudo R
    Water Sci Technol; 2008; 58(2):445-50. PubMed ID: 18701799
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Contribution of microfiltration on phosphorus removal in the sequencing anoxic/anaerobic membrane bioreactor.
    Cho J; Song KG; Ahn KH
    Bioprocess Biosyst Eng; 2009 Aug; 32(5):593-602. PubMed ID: 19048295
    [TBL] [Abstract][Full Text] [Related]  

  • 8. A comparison of endogenous processes during anaerobic starvation in anaerobic end sludge and aerobic end sludge from an anaerobic/anoxic/oxic sequencing batch reactor performing denitrifying phosphorus removal.
    Wang Y; Geng J; Peng Y; Wang C; Guo G; Liu S
    Bioresour Technol; 2012 Jan; 104():19-27. PubMed ID: 22130076
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Phosphorus removal characteristics of granular and flocculent sludge in SBR.
    Li X; Gao D; Liang H; Liu L; Fu Y
    Appl Microbiol Biotechnol; 2012 Apr; 94(1):231-6. PubMed ID: 21952941
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Non-filamentous sludge bulking caused by a deficiency of nitrogen in industrial wastewater treatment.
    Peng Y; Gao C; Wang S; Ozaki M; Takigawa A
    Water Sci Technol; 2003; 47(11):289-95. PubMed ID: 12906302
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Microbial communities in activated sludge performing enhanced biological phosphorus removal in a sequencing batch reactor.
    Jeon CO; Lee DS; Park JM
    Water Res; 2003 May; 37(9):2195-205. PubMed ID: 12691905
    [TBL] [Abstract][Full Text] [Related]  

  • 12. A new interpretation of ASM2d for modeling of SBR performance for enhanced biological phosphorus removal under different P/HAc ratios.
    Yagci N; Insel G; Tasli R; Artan N; Randall CW; Orhon D
    Biotechnol Bioeng; 2006 Feb; 93(2):258-70. PubMed ID: 16261629
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Net P-removal deterioration in enriched PAO sludge subjected to permanent aerobic conditions.
    Pijuan M; Guisasola A; Baeza JA; Carrera J; Casas C; Lafuente J
    J Biotechnol; 2006 May; 123(1):117-26. PubMed ID: 16324760
    [TBL] [Abstract][Full Text] [Related]  

  • 14. The effect of an anoxic zone on biological phosphorus removal by a sequential batch reactor.
    Akin BS; Ugurlu A
    Bioresour Technol; 2004 Aug; 94(1):1-7. PubMed ID: 15081478
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Nitrogen and phosphorus removal from an abattoir wastewater in a SBR with aerobic granular sludge.
    Cassidy DP; Belia E
    Water Res; 2005 Nov; 39(19):4817-23. PubMed ID: 16278003
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Understanding the granulation process of activated sludge in a biological phosphorus removal sequencing batch reactor.
    Wu CY; Peng YZ; Wang RD; Zhou YX
    Chemosphere; 2012 Feb; 86(8):767-73. PubMed ID: 22130123
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Experimental and model assisted investigation of an operational strategy for the BPR under low influent concentrations.
    Krühne U; Henze M; Larose A; Kolte-Olsen A; Bay Jørgensen S
    Water Res; 2003 Apr; 37(8):1953-71. PubMed ID: 12697239
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Development of a 2-sludge, 3-stage system for nitrogen and phosphorous removal from nutrient-rich wastewater using granular sludge and biofilms.
    Zhou Y; Pijuan M; Yuan Z
    Water Res; 2008 Jun; 42(12):3207-17. PubMed ID: 18472126
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Optimisation of Noosa BNR plant to improve performance and reduce operating costs.
    Thomas M; Wright P; Blackall L; Urbain V; Keller J
    Water Sci Technol; 2003; 47(12):141-8. PubMed ID: 12926681
    [TBL] [Abstract][Full Text] [Related]  

  • 20. A sequencing batch reactor system for high-level biological nitrogen and phosphorus removal from abattoir wastewater.
    Lemaire R; Yuan Z; Bernet N; Marcos M; Yilmaz G; Keller J
    Biodegradation; 2009 Jun; 20(3):339-50. PubMed ID: 18937035
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 4.