BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

460 related articles for article (PubMed ID: 18701799)

  • 1. Real-time control strategy for simultaneous nitrogen and phosphorus removal using aerobic granular sludge.
    Kishida N; Tsuneda S; Sakakibara Y; Kim JH; Sudo R
    Water Sci Technol; 2008; 58(2):445-50. PubMed ID: 18701799
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Development of a 2-sludge, 3-stage system for nitrogen and phosphorous removal from nutrient-rich wastewater using granular sludge and biofilms.
    Zhou Y; Pijuan M; Yuan Z
    Water Res; 2008 Jun; 42(12):3207-17. PubMed ID: 18472126
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Anaerobic/oxic/anoxic granular sludge process as an effective nutrient removal process utilizing denitrifying polyphosphate-accumulating organisms.
    Kishida N; Kim J; Tsuneda S; Sudo R
    Water Res; 2006 Jul; 40(12):2303-10. PubMed ID: 16766009
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Nitrogen and phosphorus removal from an abattoir wastewater in a SBR with aerobic granular sludge.
    Cassidy DP; Belia E
    Water Res; 2005 Nov; 39(19):4817-23. PubMed ID: 16278003
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Characteristics of aerobic granule and nitrogen and phosphorus removal in a SBR.
    Wang F; Lu S; Wei Y; Ji M
    J Hazard Mater; 2009 May; 164(2-3):1223-7. PubMed ID: 18980806
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Biological nitrogen removal in a step-feed CAST with real-time control treating municipal wastewater.
    Juan M; Chengyao P; Li W; Shuying W; Yang L; Ningping M; Xia Y; Yongzhen P
    Water Sci Technol; 2010; 61(9):2325-32. PubMed ID: 20418630
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Acetate injection into anaerobic settled sludge for biological P-removal in an intermittently aerated reactor.
    Ahn KH; Yoo H; Lee JW; Maeng SK; Park KY; Song KG
    Water Sci Technol; 2001; 44(1):77-85. PubMed ID: 11496681
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Simultaneous nitrification, denitrification, and phosphorus removal from nutrient-rich industrial wastewater using granular sludge.
    Yilmaz G; Lemaire R; Keller J; Yuan Z
    Biotechnol Bioeng; 2008 Jun; 100(3):529-41. PubMed ID: 18098318
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Comparison of biological removal via nitrite with real-time control using aerobic granular sludge and flocculent activated sludge.
    Gao D; Yuan X; Liang H; Wu WM
    Appl Microbiol Biotechnol; 2011 Mar; 89(5):1645-52. PubMed ID: 20972676
    [TBL] [Abstract][Full Text] [Related]  

  • 10. The effect of an anoxic zone on biological phosphorus removal by a sequential batch reactor.
    Akin BS; Ugurlu A
    Bioresour Technol; 2004 Aug; 94(1):1-7. PubMed ID: 15081478
    [TBL] [Abstract][Full Text] [Related]  

  • 11. A sequencing batch reactor system for high-level biological nitrogen and phosphorus removal from abattoir wastewater.
    Lemaire R; Yuan Z; Bernet N; Marcos M; Yilmaz G; Keller J
    Biodegradation; 2009 Jun; 20(3):339-50. PubMed ID: 18937035
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Mass balance of nitrogen, and estimates of COD, nitrogen and phosphorus used in microbial synthesis as a function of sludge retention time in a sequencing batch reactor system.
    Lee JK; Choi CK; Lee KH; Yim SB
    Bioresour Technol; 2008 Nov; 99(16):7788-96. PubMed ID: 18325762
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Effectiveness of an alternating aerobic, anoxic/anaerobic strategy for maintaining biomass activity of BNR sludge during long-term starvation.
    Yilmaz G; Lemaire R; Keller J; Yuan Z
    Water Res; 2007 Jun; 41(12):2590-8. PubMed ID: 17433405
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Organics and nitrogen removal and sludge stability in aerobic granular sludge membrane bioreactor.
    Wang J; Wang X; Zhao Z; Li J
    Appl Microbiol Biotechnol; 2008 Jun; 79(4):679-85. PubMed ID: 18465123
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Optimization of operation conditions for the startup of aerobic granular sludge reactors biologically removing carbon, nitrogen, and phosphorous.
    Lochmatter S; Holliger C
    Water Res; 2014 Aug; 59():58-70. PubMed ID: 24784454
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Comparison between UCT type and DPAO biomass phosphorus removal efficiency under aerobic and anoxic conditions.
    Kapagiannidis AG; Zafiriadis I; Aivasidis A
    Water Sci Technol; 2009; 60(10):2695-703. PubMed ID: 19923776
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Development of a real-time control strategy with artificial neural network for automatic control of a continuous-flow sequencing batch reactor.
    Cho BC; Law SL; Chang CN; Yu RF; Yang SJ; Chiou BR
    Water Sci Technol; 2001; 44(1):95-104. PubMed ID: 11496683
    [TBL] [Abstract][Full Text] [Related]  

  • 18. A novel wastewater treatment process: simultaneous nitrification, denitrification and phosphorus removal.
    Zeng RJ; Lemaire R; Yuan Z; Keller J
    Water Sci Technol; 2004; 50(10):163-70. PubMed ID: 15656309
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Biological phosphorus and nitrogen removal in a sequencing batch moving bed biofilm reactor.
    Helness H; Ødegaard H
    Water Sci Technol; 2001; 43(1):233-40. PubMed ID: 11379096
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Automatic control strategy for biological nitrogen removal of low C/N wastewater in a sequencing batch reactor.
    Kishida N; Kim JH; Chen M; Tsuneda S; Sasaki H; Sudo R
    Water Sci Technol; 2004; 50(10):45-50. PubMed ID: 15656294
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 23.