BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

130 related articles for article (PubMed ID: 19815250)

  • 1. Cost and effluent quality controllers design based on the relative gain array for a nutrient removal WWTP.
    Machado VC; Gabriel D; Lafuente J; Baeza JA
    Water Res; 2009 Dec; 43(20):5129-41. PubMed ID: 19815250
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Fuzzy-control for improved nitrogen removal and energy saving in WWT-plants with pre-denitrification.
    Meyer U; Pöpel HJ
    Water Sci Technol; 2003; 47(11):69-76. PubMed ID: 12906273
    [TBL] [Abstract][Full Text] [Related]  

  • 3. The effect of primary sedimentation on full-scale WWTP nutrient removal performance.
    Puig S; van Loosdrecht MC; Flameling AG; Colprim J; Meijer SC
    Water Res; 2010 Jun; 44(11):3375-84. PubMed ID: 20430413
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Optimisation of Noosa BNR plant to improve performance and reduce operating costs.
    Thomas M; Wright P; Blackall L; Urbain V; Keller J
    Water Sci Technol; 2003; 47(12):141-8. PubMed ID: 12926681
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Model-based control structure design of a full-scale WWTP under the retrofitting process.
    Machado VC; Lafuente J; Baeza JA
    Water Sci Technol; 2015; 71(11):1661-71. PubMed ID: 26038931
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Application of mathematical tools to improve the design and operation of activated sludge plants. Case study: the new WWTP of Galindo-Bilbao. Part II: Operational strategies and automatic controllers.
    Galarza A; Ayesa E; Linaza MT; Rivas A; Salterain A
    Water Sci Technol; 2001; 43(7):167-74. PubMed ID: 11385843
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Phased upgrading for nitrogen removal--a low cost approach.
    Solley D; Armstrong M
    Water Sci Technol; 2003; 47(11):157-63. PubMed ID: 12906285
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Upflow anaerobic sludge blanket reactor--a review.
    Bal AS; Dhagat NN
    Indian J Environ Health; 2001 Apr; 43(2):1-82. PubMed ID: 12397675
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Exploiting online in-situ ammonium, nitrate and phosphate sensors in full-scale wastewater plant operation.
    Ingildsen P; Olsson G
    Water Sci Technol; 2002; 46(4-5):139-47. PubMed ID: 12361002
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Low cost-sensors as a real alternative to on-line nitrogen analysers in continuous systems.
    Ruano MV; Ribes J; Seco A; Ferrer J
    Water Sci Technol; 2009; 60(12):3261-8. PubMed ID: 19955651
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Interaction between control and design of a SHARON reactor: economic considerations in a plant-wide (BSM2) context.
    Volcke EI; van Loosdrecht MC; Vanrolleghem PA
    Water Sci Technol; 2007; 56(9):117-25. PubMed ID: 18025739
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Real-time control strategies for predenitrification-nitrification activated sludge plants biodegradation control.
    Suescun J; Ostolaza X; Garcia-Sanz M; Ayesa E
    Water Sci Technol; 2001; 43(1):209-16. PubMed ID: 11379093
    [TBL] [Abstract][Full Text] [Related]  

  • 13. A sequencing batch reactor system for high-level biological nitrogen and phosphorus removal from abattoir wastewater.
    Lemaire R; Yuan Z; Bernet N; Marcos M; Yilmaz G; Keller J
    Biodegradation; 2009 Jun; 20(3):339-50. PubMed ID: 18937035
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Improvement of nitrogen removal at WWTP Zürich Werdhöelzli after connection of WWTP Zürich-Glatt.
    Siegrist H; Rieger L; Fux Ch; Wehrli M
    Water Sci Technol; 2004; 50(7):35-43. PubMed ID: 15553456
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Occurrence and reductions of pharmaceuticals and personal care products and estrogens by municipal wastewater treatment plants in Ontario, Canada.
    Lishman L; Smyth SA; Sarafin K; Kleywegt S; Toito J; Peart T; Lee B; Servos M; Beland M; Seto P
    Sci Total Environ; 2006 Aug; 367(2-3):544-58. PubMed ID: 16697441
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Potential phosphorus recovery in a WWTP with the BCFS process: interactions with the biological process.
    Barat R; van Loosdrecht MC
    Water Res; 2006 Nov; 40(19):3507-16. PubMed ID: 17011018
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Nitrogen loads to estuaries from waste water plumes: modeling and isotopic approaches.
    Kroeger KD; Cole ML; York JK; Valiela I
    Ground Water; 2006; 44(2):188-200. PubMed ID: 16556201
    [TBL] [Abstract][Full Text] [Related]  

  • 18. A hedging point strategy--balancing effluent quality, economy and robustness in the control of wastewater treatment plants.
    Ingildsen P; Olsson G; Yuan Z
    Water Sci Technol; 2002; 45(4-5):317-24. PubMed ID: 11936649
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Feedforward-feedback control of an activated sludge process: a simulation study.
    Vrecko D; Hvala N; Carlsson B
    Water Sci Technol; 2003; 47(12):19-26. PubMed ID: 12926665
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Controlling nitrogen removal using redox and ammonium sensors.
    Cecil D
    Water Sci Technol; 2003; 47(11):109-14. PubMed ID: 12906278
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 7.