BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

220 related articles for article (PubMed ID: 21045328)

  • 1. Effect of influent nutrient ratios and temperature on simultaneous phosphorus and nitrogen removal in a step-feed CAST.
    Ma J; Peng C; Takigawa A; Wang S; Wang L; Ma N; Liu Y; Peng Y
    Water Sci Technol; 2010; 62(9):2028-36. PubMed ID: 21045328
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Biological nitrogen removal in a step-feed CAST with real-time control treating municipal wastewater.
    Juan M; Chengyao P; Li W; Shuying W; Yang L; Ningping M; Xia Y; Yongzhen P
    Water Sci Technol; 2010; 61(9):2325-32. PubMed ID: 20418630
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Effect of influent nutrient ratios and hydraulic retention time (HRT) on simultaneous phosphorus and nitrogen removal in a two-sludge sequencing batch reactor process.
    Wang Y; Peng Y; Stephenson T
    Bioresour Technol; 2009 Jul; 100(14):3506-12. PubMed ID: 19324544
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Enhanced nutrient removal in a modified step feed process treating municipal wastewater with different inflow distribution ratios and nutrient ratios.
    Ge S; Peng Y; Wang S; Guo J; Ma B; Zhang L; Cao X
    Bioresour Technol; 2010 Dec; 101(23):9012-9. PubMed ID: 20650632
    [TBL] [Abstract][Full Text] [Related]  

  • 5. [Effects of COD/TN and HRT(s) on nutrients removal by an alternating anoxic/oxic CAST].
    Wang L; Peng YZ; Ma J; Liu Y; Ma NP
    Huan Jing Ke Xue; 2010 Oct; 31(10):2370-5. PubMed ID: 21229748
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Simultaneous nitrogen and phosphorus removal by a novel sequencing batch moving bed membrane bioreactor for wastewater treatment.
    Yang S; Yang F; Fu Z; Wang T; Lei R
    J Hazard Mater; 2010 Mar; 175(1-3):551-7. PubMed ID: 19896271
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Effect of feed characteristics on the organic matter, nitrogen and phosphorus removal in an activated sludge system treating piggery slurry.
    González C; García PA; Muñoz R
    Water Sci Technol; 2009; 60(8):2145-52. PubMed ID: 19844061
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Long term operation of pilot-scale biological nutrient removal process in treating municipal wastewater.
    Kim D; Kim KY; Ryu HD; Min KK; Lee SI
    Bioresour Technol; 2009 Jul; 100(13):3180-4. PubMed ID: 19269166
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Simultaneous nitrification, denitrification, and phosphorus removal from nutrient-rich industrial wastewater using granular sludge.
    Yilmaz G; Lemaire R; Keller J; Yuan Z
    Biotechnol Bioeng; 2008 Jun; 100(3):529-41. PubMed ID: 18098318
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Simultaneous carbon, nitrogen and phosphorous removal from municipal wastewater in a circulating fluidized bed bioreactor.
    Patel A; Zhu J; Nakhla G
    Chemosphere; 2006 Nov; 65(7):1103-12. PubMed ID: 16762392
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Simultaneous nitrogen and phosphorus removal under low dissolved oxygen conditions.
    Xia SQ; Gao TY; Zhou ZY
    J Environ Sci (China); 2001 Jan; 13(1):46-50. PubMed ID: 11590718
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Development of a 2-sludge, 3-stage system for nitrogen and phosphorous removal from nutrient-rich wastewater using granular sludge and biofilms.
    Zhou Y; Pijuan M; Yuan Z
    Water Res; 2008 Jun; 42(12):3207-17. PubMed ID: 18472126
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Control of COD/N ratio for nutrient removal in a modified membrane bioreactor (MBR) treating high strength wastewater.
    Fu Z; Yang F; Zhou F; Xue Y
    Bioresour Technol; 2009 Jan; 100(1):136-41. PubMed ID: 18640033
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Enhanced nutrient removal in three types of step feeding process from municipal wastewater.
    Peng Y; Ge S
    Bioresour Technol; 2011 Jun; 102(11):6405-13. PubMed ID: 21474307
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Biological nitrogen and phosphorus removal in UCT-type MBR process.
    Lee H; Han J; Yun Z
    Water Sci Technol; 2009; 59(11):2093-9. PubMed ID: 19494447
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Simultaneous phosphorus and nitrogen removal in a continuous-flow two-sludge system.
    Li XK; Huang RX; Bao LL; Shao CH; Zhang J
    J Environ Sci (China); 2006; 18(1):52-7. PubMed ID: 20050548
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Performance of pilot-scale vertical-flow constructed wetlands in responding to variation in influent C/N ratios of simulated urban sewage.
    Zhao YJ; Liu B; Zhang WG; Ouyang Y; An SQ
    Bioresour Technol; 2010 Mar; 101(6):1693-700. PubMed ID: 19854043
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Effect of prefermentation on denitrifying phosphorus removal in slaughterhouse wastewater.
    Merzouki M; Bernet N; Delgenès JP; Benlemlih M
    Bioresour Technol; 2005 Aug; 96(12):1317-22. PubMed ID: 15792577
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Effect of basic operating parameters on biological phosphorus removal in a continuous-flow anaerobic-anoxic activated sludge system.
    Kapagiannidis AG; Zafiriadis I; Aivasidis A
    Bioprocess Biosyst Eng; 2012 Mar; 35(3):371-82. PubMed ID: 21796365
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Influence of wastewater composition on nitrogen and phosphorus removal and process control in A2O process.
    Wang X; Peng Y; Wang S; Fan J; Cao X
    Bioprocess Biosyst Eng; 2006 May; 28(6):397-404. PubMed ID: 16508737
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 11.