These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.
318 related articles for article (PubMed ID: 21208794)
21. A BIM-based system for demolition and renovation waste estimation and planning. Cheng JC; Ma LY Waste Manag; 2013 Jun; 33(6):1539-51. PubMed ID: 23490358 [TBL] [Abstract][Full Text] [Related]
22. Evaluating the performance and intellectual structure of construction and demolition waste research during 2000-2016. Liu Y; Sun T; Yang L Environ Sci Pollut Res Int; 2017 Aug; 24(23):19259-19266. PubMed ID: 28667584 [TBL] [Abstract][Full Text] [Related]
23. Indicators to assess the recovery of natural resources contained in demolition waste. Roussat N; Méhu J; Dujet C Waste Manag Res; 2009 Mar; 27(2):159-66. PubMed ID: 19244415 [TBL] [Abstract][Full Text] [Related]
24. System dynamic modeling on construction waste management in Shenzhen, China. Tam VW; Li J; Cai H Waste Manag Res; 2014 May; 32(5):441-53. PubMed ID: 24718360 [TBL] [Abstract][Full Text] [Related]
25. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China. Wu Z; Yu ATW; Shen L Waste Manag; 2017 Feb; 60():290-300. PubMed ID: 27613414 [TBL] [Abstract][Full Text] [Related]
26. Overview regarding construction and demolition waste in Spain. Rodríguez-Robles D; García-González J; Juan-Valdés A; Morán-Del Pozo JM; Guerra-Romero MI Environ Technol; 2015; 36(23):3060-70. PubMed ID: 25230145 [TBL] [Abstract][Full Text] [Related]
27. Distribution of materials in construction and demolition waste in Portugal. Coelho A; de Brito J Waste Manag Res; 2011 Aug; 29(8):843-53. PubMed ID: 20498131 [TBL] [Abstract][Full Text] [Related]
28. Construction and demolition waste indicators. Mália M; de Brito J; Pinheiro MD; Bravo M Waste Manag Res; 2013 Mar; 31(3):241-55. PubMed ID: 23315370 [TBL] [Abstract][Full Text] [Related]
29. Construction and demolition waste generation rates for high-rise buildings in Malaysia. Mah CM; Fujiwara T; Ho CS Waste Manag Res; 2016 Dec; 34(12):1224-1230. PubMed ID: 27637272 [TBL] [Abstract][Full Text] [Related]
30. Challenges in current construction and demolition waste recycling: A China study. Ma M; Tam VWY; Le KN; Li W Waste Manag; 2020 Dec; 118():610-625. PubMed ID: 33010692 [TBL] [Abstract][Full Text] [Related]
31. A framework for understanding waste management studies in construction. Lu W; Yuan H Waste Manag; 2011 Jun; 31(6):1252-60. PubMed ID: 21330125 [TBL] [Abstract][Full Text] [Related]
32. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Jaillon L; Poon CS; Chiang YH Waste Manag; 2009 Jan; 29(1):309-20. PubMed ID: 18434128 [TBL] [Abstract][Full Text] [Related]
33. Usage of air jigging for multi-component separation of construction and demolition waste. Ambrós WM; Sampaio CH; Cazacliu BG; Miltzarek GL; Miranda LR Waste Manag; 2017 Feb; 60():75-83. PubMed ID: 27908507 [TBL] [Abstract][Full Text] [Related]
34. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors. Begum RA; Siwar C; Pereira JJ; Jaafar AH Waste Manag; 2007; 27(12):1902-9. PubMed ID: 17110094 [TBL] [Abstract][Full Text] [Related]
35. A cost compensation model for construction and demolition waste disposal in South China. Liu J; Teng Y; Jiang Y; Gong E Environ Sci Pollut Res Int; 2019 May; 26(14):13773-13784. PubMed ID: 30128974 [TBL] [Abstract][Full Text] [Related]
36. Pilot-based assessment of the economics of recycling construction demolition waste. Srour IM; Chehab GR; El-Fadel M; Tamraz S Waste Manag Res; 2013 Nov; 31(11):1170-9. PubMed ID: 23460542 [TBL] [Abstract][Full Text] [Related]
37. An analytical framework of "zero waste construction site": Two case studies of Shenzhen, China. Lu W; Bao Z; Lee WMW; Chi B; Wang J Waste Manag; 2021 Feb; 121():343-353. PubMed ID: 33418446 [TBL] [Abstract][Full Text] [Related]
38. Reclamation chain of waste concrete: A case study of Shanghai. Xiao J; Ma Z; Ding T Waste Manag; 2016 Feb; 48():334-343. PubMed ID: 26452425 [TBL] [Abstract][Full Text] [Related]
39. A web-based Decision Support System for the optimal management of construction and demolition waste. Banias G; Achillas Ch; Vlachokostas Ch; Moussiopoulos N; Papaioannou I Waste Manag; 2011 Dec; 31(12):2497-502. PubMed ID: 21835602 [TBL] [Abstract][Full Text] [Related]
40. Development of construction materials using nano-silica and aggregates recycled from construction and demolition waste. Mukharjee BB; Barai SV Waste Manag Res; 2015 Jun; 33(6):515-23. PubMed ID: 25986048 [TBL] [Abstract][Full Text] [Related] [Previous] [Next] [New Search]