153 related articles for article (PubMed ID: 22567699)
1. The macro nutrient removal efficiencies of a vertical flow constructed wetland fed with demineralized cheese whey powder solution.
Yalcuk A
Int J Phytoremediation; 2012 Feb; 14(2):114-27. PubMed ID: 22567699
[TBL] [Abstract][Full Text] [Related]
2. [Residence time distributions and spatial variation of N, P in the subsurface-flow constructed wetlands for purification of eutrophic aquaculture water].
Yang CM; Gu GQ; Li JH; Deng HH
Huan Jing Ke Xue; 2008 Nov; 29(11):3043-8. PubMed ID: 19186799
[TBL] [Abstract][Full Text] [Related]
3. Comparison between polishing (maturation) ponds and subsurface flow constructed wetlands (planted and unplanted) for the post-treatment of the effluent from UASB reactors.
von Sperling M; Dornelas FL; Assunção FA; de Paoli AC; Mabub MO
Water Sci Technol; 2010; 61(5):1201-9. PubMed ID: 20220242
[TBL] [Abstract][Full Text] [Related]
4. Comparison of horizontal and vertical constructed wetland systems for landfill leachate treatment.
Yalcuk A; Ugurlu A
Bioresour Technol; 2009 May; 100(9):2521-6. PubMed ID: 19157867
[TBL] [Abstract][Full Text] [Related]
5. Performance evaluation of planted and unplanted subsurface-flow constructed wetlands for the post-treatment of UASB reactor effluents.
Dornelas FL; Machado MB; von Sperling M
Water Sci Technol; 2009; 60(12):3025-33. PubMed ID: 19955625
[TBL] [Abstract][Full Text] [Related]
6. Performance comparison of constructed wetlands with gravel- and rice husk-based media for phenol and nitrogen removal.
Tee HC; Seng CE; Noor AM; Lim PE
Sci Total Environ; 2009 May; 407(11):3563-71. PubMed ID: 19272632
[TBL] [Abstract][Full Text] [Related]
7. Nitrogen and phosphorus removal from plant nursery runoff in vegetated and unvegetated subsurface flow wetlands.
Huett DO; Morris SG; Smith G; Hunt N
Water Res; 2005 Sep; 39(14):3259-72. PubMed ID: 16023175
[TBL] [Abstract][Full Text] [Related]
8. Nutrient removal in tropical subsurface flow constructed wetlands under batch and continuous flow conditions.
Zhang DQ; Tan SK; Gersberg RM; Zhu J; Sadreddini S; Li Y
J Environ Manage; 2012 Apr; 96(1):1-6. PubMed ID: 22208392
[TBL] [Abstract][Full Text] [Related]
9. Nutrient removal from piggery effluent using vertical flow constructed wetlands in southern Brazil.
Sezerino PH; Reginatto V; Santos MA; Kayser K; Kunst S; Philippi LS; Soares HM
Water Sci Technol; 2003; 48(2):129-35. PubMed ID: 14510203
[TBL] [Abstract][Full Text] [Related]
10. Potential of constructed wetlands in treating the eutrophic water: evidence from Taihu Lake of China.
Li L; Li Y; Biswas DK; Nian Y; Jiang G
Bioresour Technol; 2008 Apr; 99(6):1656-63. PubMed ID: 17532209
[TBL] [Abstract][Full Text] [Related]
11. Role of vegetation (Typha latifolia) on nutrient removal in a horizontal subsurface-flow constructed wetland treating UASB reactor-trickling filter effluent.
da Costa JF; Martins WL; Seidl M; von Sperling M
Water Sci Technol; 2015; 71(7):1004-10. PubMed ID: 25860702
[TBL] [Abstract][Full Text] [Related]
12. Hydrocarbon removal in an experimental gravel bed constructed wetland.
Omari K; Revitt M; Shutes B; Garelick H
Water Sci Technol; 2003; 48(5):275-81. PubMed ID: 14621174
[TBL] [Abstract][Full Text] [Related]
13. Evaluation of the treatment performance of lab-scaled vertical flow constructed wetlands in removal of organic compounds, color and nutrients in azo dye-containing wastewater.
Dogdu G; Yalcuk A
Int J Phytoremediation; 2016; 18(2):171-83. PubMed ID: 26248021
[TBL] [Abstract][Full Text] [Related]
14. Performance and behaviour of planted and unplanted units of a horizontal subsurface flow constructed wetland system treating municipal effluent from a UASB reactor.
da Costa JF; de Paoli AC; Seidl M; von Sperling M
Water Sci Technol; 2013; 68(7):1495-502. PubMed ID: 24135097
[TBL] [Abstract][Full Text] [Related]
15. [Purification efficiency of vertical-flow wetland system constructed by cinder and turf substrate on municipal wastewater].
Cui L; Zhu X; Luo S; Liu Y
Ying Yong Sheng Tai Xue Bao; 2003 Apr; 14(4):597-600. PubMed ID: 12920911
[TBL] [Abstract][Full Text] [Related]
16. Removal of pharmaceuticals in microcosm constructed wetlands using Typha spp. and LECA.
Dordio A; Carvalho AJ; Teixeira DM; Dias CB; Pinto AP
Bioresour Technol; 2010 Feb; 101(3):886-92. PubMed ID: 19783427
[TBL] [Abstract][Full Text] [Related]
17. [Characteristics of microbial biomass in subsurface constructed wetland treating eutrophic water].
Fu RB; Zhu YP; Yang HZ; Gu GW
Huan Jing Ke Xue; 2008 Oct; 29(10):2754-9. PubMed ID: 19143366
[TBL] [Abstract][Full Text] [Related]
18. Purification processes involved in sludge treatment by a vertical flow wetland system: focus on the role of the substrate and plants on N and P removal.
Korboulewsky N; Wang R; Baldy V
Bioresour Technol; 2012 Feb; 105():9-14. PubMed ID: 22178496
[TBL] [Abstract][Full Text] [Related]
19. Treatment of landfill leachate with laboratory scale vertical flow constructed wetlands: plant growth modeling.
Yalçuk A; Ugurlu A
Int J Phytoremediation; 2020; 22(2):157-166. PubMed ID: 31402676
[TBL] [Abstract][Full Text] [Related]
20. Treatment of laboratory wastewater in a tropical constructed wetland comparing surface and subsurface flow.
Meutia AA
Water Sci Technol; 2001; 44(11-12):499-506. PubMed ID: 11804141
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]