These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

100 related articles for article (PubMed ID: 22699335)

  • 1. Advanced data management for optimising the operation of a full-scale WWTP.
    Beltrán S; Maiza M; de la Sota A; Villanueva JM; Ayesa E
    Water Sci Technol; 2012; 66(2):314-20. PubMed ID: 22699335
    [TBL] [Abstract][Full Text] [Related]  

  • 2. New simulators for the optimum management and operation of wastewater treatment plant.
    Ayesa E; Garralon G; Rivas A; Suescun J; Larrea L; Plaza F
    Water Sci Technol; 2001; 44(2-3):1-8. PubMed ID: 11547971
    [TBL] [Abstract][Full Text] [Related]  

  • 3. DSC: software tool for simulation-based design of control strategies applied to wastewater treatment plants.
    Ruano MV; Ribes J; Seco A; Ferrer J
    Water Sci Technol; 2011; 63(4):796-803. PubMed ID: 21330730
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Application of mathematical tools to improve the design and operation of activated sludge plants. Case study: the new WWTP of Galindo-Bilbao. Part II: Operational strategies and automatic controllers.
    Galarza A; Ayesa E; Linaza MT; Rivas A; Salterain A
    Water Sci Technol; 2001; 43(7):167-74. PubMed ID: 11385843
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Application of mathematical tools to improve the design and operation of activated sludge plants. Case study: the new WWTP of Galindo-Bilbao. Part I: Optimum design.
    Rivas A; Ayesa E; Galarza A; Salterain A
    Water Sci Technol; 2001; 43(7):157-65. PubMed ID: 11385842
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Data evaluation of full-scale wastewater treatment plants by mass balance.
    Puig S; van Loosdrecht MC; Colprim J; Meijer SC
    Water Res; 2008 Nov; 42(18):4645-55. PubMed ID: 18786694
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Calibration and simulation of two large wastewater treatment plants operated for nutrient removal.
    Ferrer J; Morenilla JJ; Bouzas A; García-Usach F
    Water Sci Technol; 2004; 50(6):87-94. PubMed ID: 15536994
    [TBL] [Abstract][Full Text] [Related]  

  • 8. On-line estimation of suspended solids in biological reactors of WWTPs using a Kalman observer.
    Beltrán S; Irizar I; Monclús H; Rodríguez-Roda I; Ayesa E
    Water Sci Technol; 2009; 60(3):567-74. PubMed ID: 19657151
    [TBL] [Abstract][Full Text] [Related]  

  • 9. An intelligent visualisation and decision support system for decentralised wastewater treatment plants.
    Wölle J; Steinmetz H; Hansen J; Einsfeld K; Ebert A
    Water Sci Technol; 2007; 56(5):183-91. PubMed ID: 17881852
    [TBL] [Abstract][Full Text] [Related]  

  • 10. The effect of primary sedimentation on full-scale WWTP nutrient removal performance.
    Puig S; van Loosdrecht MC; Flameling AG; Colprim J; Meijer SC
    Water Res; 2010 Jun; 44(11):3375-84. PubMed ID: 20430413
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Integrated operation of sewer system and WWTP by simulation-based control of the WWTP inflow.
    Seggelke K; Rosenwinkel KH; Vanrolleghem PA; Krebs P
    Water Sci Technol; 2005; 52(5):195-203. PubMed ID: 16248196
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Supervisory control strategies for the new WWTP of Galindo-Bilbao: the long run from the conceptual design to the full-scale experimental validation.
    Ayesa E; De la Sota A; Grau P; Sagarna JM; Salterain A; Suescun J
    Water Sci Technol; 2006; 53(4-5):193-201. PubMed ID: 16722070
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Add Control: plant virtualization for control solutions in WWTP.
    Maiza M; Bengoechea A; Grau P; De Keyser W; Nopens I; Brockmann D; Steyer JP; Claeys F; Urchegui G; Fernández O; Ayesa E
    Water Sci Technol; 2013; 68(2):296-302. PubMed ID: 23863420
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Bulking control by low-dose ozonation of returned activated sludge in a full-scale wastewater treatment plant.
    Lyko S; Teichgräber B; Kraft A
    Water Sci Technol; 2012; 65(9):1654-9. PubMed ID: 22508129
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Validation and implementation of model based control strategies at an industrial wastewater treatment plant.
    Demey D; Vanderhaegen B; Vanhooren H; Liessens J; Van Eyck L; Hopkins L; Vanrolleghem PA
    Water Sci Technol; 2001; 44(2-3):145-53. PubMed ID: 11547977
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Dynamic optimisation of WWTP inflow to reduce total emission.
    Tränckner J; Franz T; Seggelke K; Krebs P
    Water Sci Technol; 2007; 56(10):11-8. PubMed ID: 18048972
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Use of artificial neural network black-box modeling for the prediction of wastewater treatment plants performance.
    Mjalli FS; Al-Asheh S; Alfadala HE
    J Environ Manage; 2007 May; 83(3):329-38. PubMed ID: 16806660
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Optimisation of a large WWTP thanks to mathematical modelling.
    Printemps C; Baudin A; Dormoy T; Zug M; Vanrolleghem PA
    Water Sci Technol; 2004; 50(7):113-22. PubMed ID: 15553466
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Implementation of a knowledge-based methodology in a decision support system for the design of suitable wastewater treatment process flow diagrams.
    Garrido-Baserba M; Reif R; Hernández F; Poch M
    J Environ Manage; 2012 Dec; 112():384-91. PubMed ID: 22982697
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Model-based evaluation of nitrogen removal in a tannery wastewater treatment plant.
    Moussa MS; Rojas AR; Hooijmans CM; Gijzen HJ; van Loosdrecht MC
    Water Sci Technol; 2004; 50(6):251-60. PubMed ID: 15537014
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 5.