These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

115 related articles for article (PubMed ID: 23064726)

  • 1. Identification and modelling the HRT distribution in subsurface constructed wetland.
    Cui L; Zhang Y; Zhang M; Li W; Zhao X; Li S; Wang Y
    J Environ Monit; 2012 Nov; 14(11):3037-44. PubMed ID: 23064726
    [TBL] [Abstract][Full Text] [Related]  

  • 2. A comparative study of five horizontal subsurface flow constructed wetlands using different plant species for domestic wastewater treatment.
    Villaseñor Camacho J; De Lucas Martínez A; Gómez Gómez R; Mena Sanz J
    Environ Technol; 2007 Dec; 28(12):1333-43. PubMed ID: 18341144
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Water reduction by constructed wetlands treating waste landfill leachate in a tropical region.
    Ogata Y; Ishigaki T; Ebie Y; Sutthasil N; Chiemchaisri C; Yamada M
    Waste Manag; 2015 Oct; 44():164-71. PubMed ID: 26209341
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Performance evaluation of different horizontal subsurface flow wetland types by characterization of flow behavior, mass removal and depth-dependent contaminant load.
    Seeger EM; Maier U; Grathwohl P; Kuschk P; Kaestner M
    Water Res; 2013 Feb; 47(2):769-80. PubMed ID: 23200508
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Comparative evaluation of pilot scale horizontal subsurface-flow constructed wetlands and plant root mats for treating groundwater contaminated with benzene and MTBE.
    Chen Z; Kuschk P; Reiche N; Borsdorf H; Kästner M; Köser H
    J Hazard Mater; 2012 Mar; 209-210():510-5. PubMed ID: 22326241
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Nitrate removal from groundwater using constructed wetlands under various hydraulic loading rates.
    Lin YF; Jing SR; Lee DY; Chang YF; Shih KC
    Bioresour Technol; 2008 Nov; 99(16):7504-13. PubMed ID: 18387297
    [TBL] [Abstract][Full Text] [Related]  

  • 7. The effect of pre-aeration on the purification processes in the long-term performance of a horizontal subsurface flow constructed wetland.
    Noorvee A; Põldvere E; Mander U
    Sci Total Environ; 2007 Jul; 380(1-3):229-36. PubMed ID: 17118430
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Pharmaceutical removal in tropical subsurface flow constructed wetlands at varying hydraulic loading rates.
    Zhang DQ; Gersberg RM; Hua T; Zhu J; Tuan NA; Tan SK
    Chemosphere; 2012 Apr; 87(3):273-7. PubMed ID: 22264861
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Potential of constructed wetlands in treating the eutrophic water: evidence from Taihu Lake of China.
    Li L; Li Y; Biswas DK; Nian Y; Jiang G
    Bioresour Technol; 2008 Apr; 99(6):1656-63. PubMed ID: 17532209
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Gaseous fluxes in the nitrogen and carbon budgets of subsurface flow constructed wetlands.
    Mander U; Lõhmus K; Teiter S; Mauring T; Nurk K; Augustin J
    Sci Total Environ; 2008 Oct; 404(2-3):343-53. PubMed ID: 18486194
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Development of a horizontal subsurface flow modular constructed wetland for urban runoff treatment.
    Choi JY; Maniquiz MC; Geronimo FK; Lee SY; Lee BS; Kim LH
    Water Sci Technol; 2012; 66(9):1950-7. PubMed ID: 22925868
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Nitrate reduction in a simulated free-water surface wetland system.
    Misiti TM; Hajaya MG; Pavlostathis SG
    Water Res; 2011 Nov; 45(17):5587-98. PubMed ID: 21885082
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Evaluation of the seasonal performance of a water reclamation pond-constructed wetland system for removing emerging contaminants.
    Matamoros V; Salvadó V
    Chemosphere; 2012 Jan; 86(2):111-7. PubMed ID: 22051341
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Remediation of ammonia-rich minewater in constructed wetlands.
    Demin OA; Dudeney AW; Tarasova II
    Environ Technol; 2002 May; 23(5):497-514. PubMed ID: 12090256
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Effect of physico-chemical pretreatment on the removal efficiency of horizontal subsurface-flow constructed wetlands.
    Caselles-Osorio A; Garcia J
    Environ Pollut; 2007 Mar; 146(1):55-63. PubMed ID: 16996180
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Effects of intermittent loading on nitrogen removal in horizontal subsurface flow wetlands.
    Forbes MG; Yelderman JC; Potterton T; Doyle RD
    Water Sci Technol; 2010; 62(8):1865-71. PubMed ID: 20962402
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Effect of vegetation in pilot-scale horizontal subsurface flow constructed wetlands treating sulphate rich groundwater contaminated with a low and high chlorinated hydrocarbon.
    Chen Z; Wu S; Braeckevelt M; Paschke H; Kästner M; Köser H; Kuschk P
    Chemosphere; 2012 Oct; 89(6):724-31. PubMed ID: 22832338
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Batch versus continuous feeding strategies for pharmaceutical removal by subsurface flow constructed wetland.
    Zhang DQ; Gersberg RM; Zhu J; Hua T; Jinadasa KB; Tan SK
    Environ Pollut; 2012 Aug; 167():124-31. PubMed ID: 22564400
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Hydraulic residence time and iron removal in a wetland receiving ferruginous mine water over a 4 year period from commissioning.
    Kusin FM; Jarvis AP; Gandy CJ
    Water Sci Technol; 2010; 62(8):1937-46. PubMed ID: 20962411
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Dynamics of phosphorus, nitrogen and carbon removal in a horizontal subsurface flow constructed wetland.
    Vohla C; Alas R; Nurk K; Baatz S; Mander U
    Sci Total Environ; 2007 Jul; 380(1-3):66-74. PubMed ID: 17081592
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 6.