333 related articles for article (PubMed ID: 26969286)
1. A system dynamics-based environmental performance simulation of construction waste reduction management in China.
Ding Z; Yi G; Tam VWY; Huang T
Waste Manag; 2016 May; 51():130-141. PubMed ID: 26969286
[TBL] [Abstract][Full Text] [Related]
2. System dynamic modeling on construction waste management in Shenzhen, China.
Tam VW; Li J; Cai H
Waste Manag Res; 2014 May; 32(5):441-53. PubMed ID: 24718360
[TBL] [Abstract][Full Text] [Related]
3. Identification of critical factors in construction and demolition waste recycling by the grey-DEMATEL approach: a Chinese perspective.
Liu H; Long H; Li X
Environ Sci Pollut Res Int; 2020 Mar; 27(8):8507-8525. PubMed ID: 31907809
[TBL] [Abstract][Full Text] [Related]
4. Estimation of building-related construction and demolition waste in Shanghai.
Ding T; Xiao J
Waste Manag; 2014 Nov; 34(11):2327-34. PubMed ID: 25164857
[TBL] [Abstract][Full Text] [Related]
5. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China.
Lu W; Yuan H; Li J; Hao JJ; Mi X; Ding Z
Waste Manag; 2011 Apr; 31(4):680-7. PubMed ID: 21208794
[TBL] [Abstract][Full Text] [Related]
6. A system dynamic model for simulating the potential of prefabrication on construction waste reduction.
Yuan R; Guo F; Qian Y; Cheng B; Li J; Tang X; Peng X
Environ Sci Pollut Res Int; 2022 Feb; 29(9):12589-12600. PubMed ID: 33993449
[TBL] [Abstract][Full Text] [Related]
7. Evaluating the effects of policies on building construction waste management: a hybrid dynamic approach.
Ding Z; Sun Z; Liu R; Xu X
Environ Sci Pollut Res Int; 2023 May; 30(25):67378-67397. PubMed ID: 37103696
[TBL] [Abstract][Full Text] [Related]
8. System dynamic analysis of construction waste recycling industry chain in China.
Liu J; Teng Y; Wang D; Gong E
Environ Sci Pollut Res Int; 2020 Oct; 27(30):37260-37277. PubMed ID: 31893357
[TBL] [Abstract][Full Text] [Related]
9. Improving Contractors' Participation of Resource Utilization in Construction and Demolition Waste through Government Incentives and Punishments.
Cheng B; Huang J; Li J; Chen S; Chen H
Environ Manage; 2022 Oct; 70(4):666-680. PubMed ID: 35385981
[TBL] [Abstract][Full Text] [Related]
10. Waste generated in high-rise buildings construction: a quantification model based on statistical multiple regression.
Parisi Kern A; Ferreira Dias M; Piva Kulakowski M; Paulo Gomes L
Waste Manag; 2015 May; 39():35-44. PubMed ID: 25704604
[TBL] [Abstract][Full Text] [Related]
11. Pilot-based assessment of the economics of recycling construction demolition waste.
Srour IM; Chehab GR; El-Fadel M; Tamraz S
Waste Manag Res; 2013 Nov; 31(11):1170-9. PubMed ID: 23460542
[TBL] [Abstract][Full Text] [Related]
12. Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong.
Hossain MU; Wu Z; Poon CS
Waste Manag; 2017 Nov; 69():325-335. PubMed ID: 28781157
[TBL] [Abstract][Full Text] [Related]
13. Evaluating the performance and intellectual structure of construction and demolition waste research during 2000-2016.
Liu Y; Sun T; Yang L
Environ Sci Pollut Res Int; 2017 Aug; 24(23):19259-19266. PubMed ID: 28667584
[TBL] [Abstract][Full Text] [Related]
14. Evolutionary game model of construction enterprises and construction material manufacturers in the construction and demolition waste resource utilization.
Shao Z; Li M; Han C; Meng L
Waste Manag Res; 2023 Feb; 41(2):477-495. PubMed ID: 36134682
[TBL] [Abstract][Full Text] [Related]
15. A cost compensation model for construction and demolition waste disposal in South China.
Liu J; Teng Y; Jiang Y; Gong E
Environ Sci Pollut Res Int; 2019 May; 26(14):13773-13784. PubMed ID: 30128974
[TBL] [Abstract][Full Text] [Related]
16. Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis.
Kucukvar M; Egilmez G; Tatari O
Waste Manag Res; 2014 Jun; 32(6):500-8. PubMed ID: 24855225
[TBL] [Abstract][Full Text] [Related]
17. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.
Wu Z; Yu ATW; Shen L
Waste Manag; 2017 Feb; 60():290-300. PubMed ID: 27613414
[TBL] [Abstract][Full Text] [Related]
18. Distribution of materials in construction and demolition waste in Portugal.
Coelho A; de Brito J
Waste Manag Res; 2011 Aug; 29(8):843-53. PubMed ID: 20498131
[TBL] [Abstract][Full Text] [Related]
19. A closed-loop life cycle assessment of recycled aggregate concrete utilization in China.
Ding T; Xiao J; Tam VW
Waste Manag; 2016 Oct; 56():367-75. PubMed ID: 27297045
[TBL] [Abstract][Full Text] [Related]
20. Comminution and sizing processes of concrete block waste as recycled aggregates.
Gomes PC; Ulsen C; Pereira FA; Quattrone M; Angulo SC
Waste Manag; 2015 Nov; 45():171-9. PubMed ID: 26168872
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]