These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.
120 related articles for article (PubMed ID: 27054305)
1. Mining the physical infrastructure: Opportunities, barriers and interventions in promoting structural components reuse. Iacovidou E; Purnell P Sci Total Environ; 2016 Jul; 557-558():791-807. PubMed ID: 27054305 [TBL] [Abstract][Full Text] [Related]
2. The use of smart technologies in enabling construction components reuse: A viable method or a problem creating solution? Iacovidou E; Purnell P; Lim MK J Environ Manage; 2018 Jun; 216():214-223. PubMed ID: 28483593 [TBL] [Abstract][Full Text] [Related]
3. Business models for the reuse of construction and demolition waste. Buchard MV; Christensen TB Waste Manag Res; 2024 May; 42(5):359-371. PubMed ID: 37519293 [TBL] [Abstract][Full Text] [Related]
4. Establishing and testing the "reuse potential" indicator for managing wastes as resources. Park JY; Chertow MR J Environ Manage; 2014 May; 137():45-53. PubMed ID: 24594758 [TBL] [Abstract][Full Text] [Related]
5. Circular Economy on Construction and Demolition Waste: A Literature Review on Material Recovery and Production. Ginga CP; Ongpeng JMC; Daly MKM Materials (Basel); 2020 Jul; 13(13):. PubMed ID: 32635157 [TBL] [Abstract][Full Text] [Related]
6. Components reuse in the building sector - A systematic review. Rakhshan K; Morel JC; Alaka H; Charef R Waste Manag Res; 2020 Apr; 38(4):347-370. PubMed ID: 32116140 [TBL] [Abstract][Full Text] [Related]
7. A BIM-based system for demolition and renovation waste estimation and planning. Cheng JC; Ma LY Waste Manag; 2013 Jun; 33(6):1539-51. PubMed ID: 23490358 [TBL] [Abstract][Full Text] [Related]
8. Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil. Penteado CS; Rosado LP Waste Manag Res; 2016 Oct; 34(10):1026-1035. PubMed ID: 27443296 [TBL] [Abstract][Full Text] [Related]
9. Pilot-based assessment of the economics of recycling construction demolition waste. Srour IM; Chehab GR; El-Fadel M; Tamraz S Waste Manag Res; 2013 Nov; 31(11):1170-9. PubMed ID: 23460542 [TBL] [Abstract][Full Text] [Related]
10. Closed cycle construction: an integrated process for the separation and reuse of C&D waste. Mulder E; de Jong TP; Feenstra L Waste Manag; 2007; 27(10):1408-15. PubMed ID: 17532617 [TBL] [Abstract][Full Text] [Related]
11. Evaluating environmental impacts of alternative construction waste management approaches using supply-chain-linked life-cycle analysis. Kucukvar M; Egilmez G; Tatari O Waste Manag Res; 2014 Jun; 32(6):500-8. PubMed ID: 24855225 [TBL] [Abstract][Full Text] [Related]
12. Mitigation of global greenhouse gas emissions from waste: conclusions and strategies from the Intergovernmental Panel on Climate Change (IPCC) Fourth Assessment Report. Working Group III (Mitigation). Bogner J; Pipatti R; Hashimoto S; Diaz C; Mareckova K; Diaz L; Kjeldsen P; Monni S; Faaij A; Gao Q; Zhang T; Ahmed MA; Sutamihardja RT; Gregory R; Waste Manag Res; 2008 Feb; 26(1):11-32. PubMed ID: 18338699 [TBL] [Abstract][Full Text] [Related]
13. Unbuilding the city: Deconstruction and the circular economy in Vancouver. Lynch N Environ Plan A; 2022 Nov; 54(8):1586-1603. PubMed ID: 36176592 [TBL] [Abstract][Full Text] [Related]
14. Construction and demolition waste indicators. Mália M; de Brito J; Pinheiro MD; Bravo M Waste Manag Res; 2013 Mar; 31(3):241-55. PubMed ID: 23315370 [TBL] [Abstract][Full Text] [Related]
15. Building waste management in Bulgaria: challenges and opportunities. Hadjieva-Zaharieva R; Dimitrova E; Buyle-Bodin F Waste Manag; 2003; 23(8):749-61. PubMed ID: 14522194 [TBL] [Abstract][Full Text] [Related]
16. Environmental analysis of a construction and demolition waste recycling plant in Portugal--Part I: energy consumption and CO2 emissions. Coelho A; de Brito J Waste Manag; 2013 May; 33(5):1258-67. PubMed ID: 23422042 [TBL] [Abstract][Full Text] [Related]
17. Management of excavated soil and dredging spoil waste from construction and demolition within the EU: Practices, impacts and perspectives. Cristóbal J; Foster G; Caro D; Yunta F; Manfredi S; Tonini D Sci Total Environ; 2024 Sep; 944():173859. PubMed ID: 38857794 [TBL] [Abstract][Full Text] [Related]
18. Closed-loop recycling of construction and demolition waste in Germany in view of stricter environmental threshold values. Weil M; Jeske U; Schebek L Waste Manag Res; 2006 Jun; 24(3):197-206. PubMed ID: 16784162 [TBL] [Abstract][Full Text] [Related]
19. Uncovering the Spatiotemporal Dynamics of Urban Infrastructure Development: A High Spatial Resolution Material Stock and Flow Analysis. Han J; Chen WQ; Zhang L; Liu G Environ Sci Technol; 2018 Nov; 52(21):12122-12132. PubMed ID: 30277072 [TBL] [Abstract][Full Text] [Related]
20. Stakeholder perceptions on implementing design for disassembly and standardisation for heterogeneous construction components. Anastasiades K; Dockx J; van den Berg M; Rinke M; Blom J; Audenaert A Waste Manag Res; 2023 Aug; 41(8):1372-1381. PubMed ID: 37052248 [TBL] [Abstract][Full Text] [Related] [Next] [New Search]