249 related articles for article (PubMed ID: 28316122)
1. Digital Workflow for Fixed Implant Rehabilitation of an Extremely Atrophic Edentulous Mandible in Three Appointments.
Papaspyridakos P; Rajput N; Kudara Y; Weber HP
J Esthet Restor Dent; 2017 May; 29(3):178-188. PubMed ID: 28316122
[TBL] [Abstract][Full Text] [Related]
2. Digital Workflow: From Guided Surgery to Final Full-Arch Implant Prosthesis in Three Visits.
Papaspyridakos P; Ben Yehuda D; Rajput N; Weber HP
Compend Contin Educ Dent; 2018; 39(7):e1-e4. PubMed ID: 30020795
[TBL] [Abstract][Full Text] [Related]
3. Complete Digital Workflow for Mandibular Full-Arch Implant Rehabilitation in 3 Appointments.
Papaspyridakos P; De Souza A; Bathija A; Kang K; Chochlidakis K
J Prosthodont; 2021 Jul; 30(6):548-552. PubMed ID: 33811713
[TBL] [Abstract][Full Text] [Related]
4. Ratios of Cantilever Lengths and Anterior-Posterior Spreads of Definitive Hybrid Full-Arch, Screw-Retained Prostheses: Results of a Clinical Study.
Drago C
J Prosthodont; 2018 Jun; 27(5):402-408. PubMed ID: 27416302
[TBL] [Abstract][Full Text] [Related]
5. A randomized controlled clinical trial of edentulous patients treated with immediately loaded implant-supported mandibular fixed prostheses.
Alfadda SA
Clin Implant Dent Relat Res; 2014 Dec; 16(6):806-16. PubMed ID: 23506407
[TBL] [Abstract][Full Text] [Related]
6. Definitive CAD/CAM-guided prosthesis for immediate loading of bone-grafted maxilla: a case report.
Kupeyan HK; Shaffner M; Armstrong J
Clin Implant Dent Relat Res; 2006; 8(3):161-7. PubMed ID: 16919024
[TBL] [Abstract][Full Text] [Related]
7. An alternative digital workflow for fabricating a mandibular implant-supported complete fixed dental prosthesis with limited restorative space: A clinical report.
Belur D; Nagy WW
J Prosthet Dent; 2018 Jul; 120(1):1-4. PubMed ID: 29580562
[TBL] [Abstract][Full Text] [Related]
8. Immediate loading of definitive implants in the edentulous mandible using a fixed provisional prosthesis: The denture conversion technique.
Misch CM
J Oral Maxillofac Surg; 2004 Sep; 62(9 Suppl 2):106-15. PubMed ID: 15332187
[TBL] [Abstract][Full Text] [Related]
9. Immediate loading of two implants with a mandibular implant-retained overdenture: a new treatment protocol.
Stoker GT; Wismeijer D
Clin Implant Dent Relat Res; 2011 Dec; 13(4):255-61. PubMed ID: 19681940
[TBL] [Abstract][Full Text] [Related]
10. Immediate loading of two flapless placed mandibular implants supporting cross-arch fixed prostheses: A 5-year follow-up prospective single cohort study.
Cannizzaro G; Felice P; Lazzarini M; Ferri V; Leone M; Trullenque-Eriksson A; Esposito M
Eur J Oral Implantol; 2016; 9 Suppl 1(2):165-77. PubMed ID: 27314124
[TBL] [Abstract][Full Text] [Related]
11. Fabrication of an implant-supported fixed complete denture using multiple digital technologies for a patient with a perioral burn: A clinical report.
Ovchinnik V; Karatas B; Yilmaz B; McGlumphy EA
J Prosthet Dent; 2018 Aug; 120(2):161-167. PubMed ID: 29551383
[TBL] [Abstract][Full Text] [Related]
12. Clinical evaluation of immediate loading of electroeroded screw-retained titanium fixed prostheses supported by tilted implant: a multicenter retrospective study.
Acocella A; Ercoli C; Geminiani A; Feng C; Billi M; Acocella G; Giannini D; Sacco R
Clin Implant Dent Relat Res; 2012 May; 14 Suppl 1():e98-108. PubMed ID: 22013945
[TBL] [Abstract][Full Text] [Related]
13. Comparison of three-implant-supported fixed dentures and two-implant-retained overdentures in the edentulous mandible: a pilot study of treatment efficacy and patient satisfaction.
De Kok IJ; Chang KH; Lu TS; Cooper LF
Int J Oral Maxillofac Implants; 2011; 26(2):415-26. PubMed ID: 21483895
[TBL] [Abstract][Full Text] [Related]
14. A clinical study of edentulous patients rehabilitated according to the "all on four" immediate function protocol.
Crespi R; Vinci R; Capparé P; Romanos GE; Gherlone E
Int J Oral Maxillofac Implants; 2012; 27(2):428-34. PubMed ID: 22442784
[TBL] [Abstract][Full Text] [Related]
15. Early functional loading in the fully edentulous mandible after mandibular resection and reconstruction due to an ameloblastoma: case report.
Becker W; Wong J
Clin Implant Dent Relat Res; 2003; 5(1):47-51. PubMed ID: 12831728
[TBL] [Abstract][Full Text] [Related]
16. Early functional loading at 5 days for Brånemark implants placed into edentulous mandibles: a prospective, open-ended, longitudinal study.
Becker W; Becker BE; Huffstetlert S
J Periodontol; 2003 May; 74(5):695-702. PubMed ID: 12816303
[TBL] [Abstract][Full Text] [Related]
17. Immediate loading of a fixed full-arch prosthesis on four template-guided implants.
Herklotz I; Kunz A; Stimmelmayr M; Beuer F
Int J Comput Dent; 2022 Jul; 25(2):221-231. PubMed ID: 35851358
[TBL] [Abstract][Full Text] [Related]
18. Immediate loading of 2 (all-on-2) flapless-placed mandibular implants supporting cross-arch fixed prostheses: interim data from a 1-year follow-up prospective single cohort study.
Cannizzaro G; Felice P; Giorgi A; Lazzarini M; Ferri V; Leone M; Esposito M
Eur J Oral Implantol; 2012; 5(1):49-58. PubMed ID: 22518379
[TBL] [Abstract][Full Text] [Related]
19. Immediate loading of immediate mandibular implants with a full-arch fixed prosthesis: a preliminary study.
Peñarrocha M; Boronat A; Garcia B
J Oral Maxillofac Surg; 2009 Jun; 67(6):1286-93. PubMed ID: 19446218
[TBL] [Abstract][Full Text] [Related]
20. Immediate loading of fixed cross-arch prostheses supported by flapless-placed supershort or long implants: 1-year results from a randomised controlled trial.
Cannizzaro G; Felice P; Buti J; Leone M; Ferri V; Esposito M
Eur J Oral Implantol; 2015; 8(1):27-36. PubMed ID: 25738177
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]