BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

187 related articles for article (PubMed ID: 28866746)

  • 1. Composting plant leachate treatment by a pilot-scale, three-stage, horizontal flow constructed wetland in central Iran.
    Bakhshoodeh R; Alavi N; Paydary P
    Environ Sci Pollut Res Int; 2017 Oct; 24(30):23803-23814. PubMed ID: 28866746
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Removing heavy metals from Isfahan composting leachate by horizontal subsurface flow constructed wetland.
    Bakhshoodeh R; Alavi N; Soltani Mohammadi A; Ghanavati H
    Environ Sci Pollut Res Int; 2016 Jun; 23(12):12384-91. PubMed ID: 26983810
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Purification of leachate from sludge treatment beds by subsurface flow constructed wetlands: effects of plants and hydraulic retention time.
    Hu S; Chen Z; Lv Z; Chen K; Huang L; Zuo X; He J; Chen Y
    Environ Sci Pollut Res Int; 2019 Feb; 26(6):5769-5781. PubMed ID: 30612364
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Comparison of horizontal and vertical constructed wetland systems for landfill leachate treatment.
    Yalcuk A; Ugurlu A
    Bioresour Technol; 2009 May; 100(9):2521-6. PubMed ID: 19157867
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Landfill leachate treatment using sub-surface flow constructed wetland by Cyperus haspan.
    Akinbile CO; Yusoff MS; Ahmad Zuki AZ
    Waste Manag; 2012 Jul; 32(7):1387-93. PubMed ID: 22456086
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Removing Organic Matter and Nutrients from Pig Farm Wastewater with a Constructed Wetland System.
    De La Mora-Orozco C; González-Acuña IJ; Saucedo-Terán RA; Flores-López HE; Rubio-Arias HO; Ochoa-Rivero JM
    Int J Environ Res Public Health; 2018 May; 15(5):. PubMed ID: 29883370
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Study on the removal of hormones from domestic wastewaters with lab-scale constructed wetlands with different substrates and flow directions.
    Herrera-Melián JA; Guedes-Alonso R; Borreguero-Fabelo A; Santana-Rodríguez JJ; Sosa-Ferrera Z
    Environ Sci Pollut Res Int; 2018 Jul; 25(21):20374-20384. PubMed ID: 28567681
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Temporal and spatial variations of contaminant removal, enzyme activities, and microbial community structure in a pilot horizontal subsurface flow constructed wetland purifying industrial runoff.
    Yi XH; Jing DD; Wan J; Ma Y; Wang Y
    Environ Sci Pollut Res Int; 2016 May; 23(9):8565-76. PubMed ID: 26797946
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Pollutant removal within hybrid constructed wetland systems in tropical regions.
    Yeh TY; Wu CH
    Water Sci Technol; 2009; 59(2):233-40. PubMed ID: 19182332
    [TBL] [Abstract][Full Text] [Related]  

  • 10. The removal efficiency of constructed wetlands filled with the zeolite-slag hybrid substrate for the rural landfill leachate treatment.
    He H; Duan Z; Wang Z; Yue B
    Environ Sci Pollut Res Int; 2017 Jul; 24(21):17547-17555. PubMed ID: 28597381
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Use of vetiver grass constructed wetland for treatment of leachate.
    Bwire KM; Njau KN; Minja RJ
    Water Sci Technol; 2011; 63(5):924-30. PubMed ID: 21411942
    [TBL] [Abstract][Full Text] [Related]  

  • 12. A pilot study of a subsurface-flow constructed wetland treating membrane concentrate produced from reclaimed water.
    Chakraborti RK; Bays JS; Ng T; Balderrama L; Kirsch T
    Water Sci Technol; 2015; 72(2):260-8. PubMed ID: 26177409
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Influence of recirculation over COD and N-NH
    Cano V; Vich DV; Rousseau DPL; Lens PNL; Nolasco MA
    Int J Phytoremediation; 2019; 21(10):998-1004. PubMed ID: 31016986
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Analysis of ammonia-nitrogen removal kinetics by stage in pilot scale vertical flow wetlands treating landfill leachate in series.
    Lott DJ; Laux SJ; Townsend TG
    Chemosphere; 2024 Jul; 360():142409. PubMed ID: 38782135
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Potential and limits of landfill leachate treatment in a multi-stage subsurface flow constructed wetland - Evaluation of organics and nitrogen removal.
    Wojciechowska E
    Bioresour Technol; 2017 Jul; 236():146-154. PubMed ID: 28399418
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Treatment of landfill leachate using an aerated, horizontal subsurface-flow constructed wetland.
    Nivala J; Hoos MB; Cross C; Wallace S; Parkin G
    Sci Total Environ; 2007 Jul; 380(1-3):19-27. PubMed ID: 17241653
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Nitrogen dynamics in a constructed wetland system treating landfill leachate.
    Kinsley CB; Crolla AM; Kuyucak N; Zimmer M; Laflèche A
    Water Sci Technol; 2007; 56(3):151-8. PubMed ID: 17802850
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Pollutant removal from landfill leachate employing two-stage constructed wetland mesocosms: co-treatment with municipal sewage.
    Saeed T; Miah MJ; Majed N; Hasan M; Khan T
    Environ Sci Pollut Res Int; 2020 Aug; 27(22):28316-28332. PubMed ID: 32415455
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Study of domestic wastewater treatment using Moringa oleifera coagulant coupled with vertical flow constructed wetland in Kibera Slum, Kenya.
    Kilingo FM; Bernard Z; Hongbin C
    Environ Sci Pollut Res Int; 2022 May; 29(24):36589-36607. PubMed ID: 35064879
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Modeling organic matter and nitrogen removal from domestic wastewater in a pilot-scale vertical subsurface flow constructed wetland.
    Bustillo-Lecompte CF; Mehrvar M; Quiñones-Bolaños E; Castro-Faccetti CF
    J Environ Sci Health A Tox Hazard Subst Environ Eng; 2016; 51(5):414-24. PubMed ID: 26818608
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 10.