479 related articles for article (PubMed ID: 29551383)
1. Fabrication of an implant-supported fixed complete denture using multiple digital technologies for a patient with a perioral burn: A clinical report.
Ovchinnik V; Karatas B; Yilmaz B; McGlumphy EA
J Prosthet Dent; 2018 Aug; 120(2):161-167. PubMed ID: 29551383
[TBL] [Abstract][Full Text] [Related]
2. Digitally planned and fabricated mandibular fixed complete dentures. Part 2. Prosthodontic phase.
Kattadiyil MT; Goodacre CJ; Lozada JL; Garbacea A
Int J Prosthodont; 2015; 28(2):119-23. PubMed ID: 25822295
[TBL] [Abstract][Full Text] [Related]
3. A digital technique for fabricating an interim implant-supported fixed prosthesis immediately after implant placement in patients with complete edentulism.
Oh JH; An X; Jeong SM; Choi BH
J Prosthet Dent; 2019 Jan; 121(1):26-31. PubMed ID: 29961624
[TBL] [Abstract][Full Text] [Related]
4. A randomized controlled clinical trial of edentulous patients treated with immediately loaded implant-supported mandibular fixed prostheses.
Alfadda SA
Clin Implant Dent Relat Res; 2014 Dec; 16(6):806-16. PubMed ID: 23506407
[TBL] [Abstract][Full Text] [Related]
5. Comparison of three-implant-supported fixed dentures and two-implant-retained overdentures in the edentulous mandible: a pilot study of treatment efficacy and patient satisfaction.
De Kok IJ; Chang KH; Lu TS; Cooper LF
Int J Oral Maxillofac Implants; 2011; 26(2):415-26. PubMed ID: 21483895
[TBL] [Abstract][Full Text] [Related]
6. Implant-supported maxillary denture retained by a telescopic abutment system: A clinical report.
Morandi R; Cabral LM; de Moraes M
J Prosthet Dent; 2017 Mar; 117(3):331-334. PubMed ID: 27692580
[TBL] [Abstract][Full Text] [Related]
7. Zygomatic implant-retained fixed complete denture for an elderly patient.
Baig MR; Rajan G; Yunus N
Gerodontology; 2012 Jun; 29(2):e1140-5. PubMed ID: 21615782
[TBL] [Abstract][Full Text] [Related]
8. "All-on-four" concept and immediate loading for simultaneous rehabilitation of the atrophic maxilla and mandible with conventional and zygomatic implants.
Ferreira EJ; Kuabara MR; Gulinelli JL
Br J Oral Maxillofac Surg; 2010 Apr; 48(3):218-20. PubMed ID: 19767132
[TBL] [Abstract][Full Text] [Related]
9. Virtually guided alveolar ridge reduction combined with computer-aided implant placement for a bimaxillary implant-supported rehabilitation: A clinical report.
Beretta M; Poli PP; Tansella S; Maiorana C
J Prosthet Dent; 2018 Aug; 120(2):168-172. PubMed ID: 29429840
[TBL] [Abstract][Full Text] [Related]
10. A technique for immediate occlusal implant loading of a completely edentulous mandible: a clinical report.
Paniz G; Chierico A; Tomasi P; Cuel S
J Prosthet Dent; 2012 Apr; 107(4):221-6. PubMed ID: 22475464
[TBL] [Abstract][Full Text] [Related]
11. The rehabilitation of an edentulous mandible with a CAD/CAM zirconia framework and heat-pressed lithium disilicate ceramic crowns: a clinical report.
Cho Y; Raigrodski AJ
J Prosthet Dent; 2014 Jun; 111(6):443-7. PubMed ID: 24602417
[TBL] [Abstract][Full Text] [Related]
12. Immediate loading and implant-bar overdenture.
Chang J; Millstein P
J Prosthet Dent; 2014 Oct; 112(4):710-2. PubMed ID: 24787132
[TBL] [Abstract][Full Text] [Related]
13. Complete arch implant rehabilitation using subtractive rapid prototyping and porcelain fused to zirconia prosthesis: a clinical report.
Papaspyridakos P; Lal K
J Prosthet Dent; 2008 Sep; 100(3):165-72. PubMed ID: 18762028
[TBL] [Abstract][Full Text] [Related]
14. Immediate loading of definitive implants in the edentulous mandible using a fixed provisional prosthesis: The denture conversion technique.
Misch CM
J Oral Maxillofac Surg; 2004 Sep; 62(9 Suppl 2):106-15. PubMed ID: 15332187
[TBL] [Abstract][Full Text] [Related]
15. Application of Ce-TZP/Al
Hagiwara Y; Nakajima K
J Prosthodont Res; 2016 Oct; 60(4):337-343. PubMed ID: 26944223
[TBL] [Abstract][Full Text] [Related]
16. Rehabilitation of the edentulous maxilla complicated by combination syndrome with an implant overdenture: a case report.
Piermatti J
Gen Dent; 2013 Aug; 61(5):64-9. PubMed ID: 23928443
[TBL] [Abstract][Full Text] [Related]
17. Complete-arch maxillary rehabilitation using a custom-designed and manufactured titanium framework: a clinical report.
Ehrenkranz H; Langer B; Marotta L
J Prosthet Dent; 2008 Jan; 99(1):8-13. PubMed ID: 18182179
[TBL] [Abstract][Full Text] [Related]
18. A clinical study of edentulous patients rehabilitated according to the "all on four" immediate function protocol.
Crespi R; Vinci R; Capparé P; Romanos GE; Gherlone E
Int J Oral Maxillofac Implants; 2012; 27(2):428-34. PubMed ID: 22442784
[TBL] [Abstract][Full Text] [Related]
19. Simplified fabrication of an implant-supported framework with luted abutment cylinders.
Stumpel LJ
J Prosthet Dent; 2017 Jul; 118(1):5-9. PubMed ID: 28024820
[TBL] [Abstract][Full Text] [Related]
20. Using the "final-on-four" concept to deliver an immediate metal-resin implant-fixed complete dental prosthesis.
Yilmaz B; Ozcelik TB; McGlumphy E
J Prosthet Dent; 2015 Aug; 114(2):161-6. PubMed ID: 25935086
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]