170 related articles for article (PubMed ID: 32431866)
1. Comprehensive evaluation system for stability of multiple dams in a uranium tailings reservoir: based on the TOPSIS model and bow tie model.
Jiang F; Wu H; Liu Y; Chen G; Guo J; Wang Z
R Soc Open Sci; 2020 Apr; 7(4):191566. PubMed ID: 32431866
[TBL] [Abstract][Full Text] [Related]
2. Mine safety assessment using gray relational analysis and bow tie model.
Xu Q; Xu K
PLoS One; 2018; 13(3):e0193576. PubMed ID: 29561875
[TBL] [Abstract][Full Text] [Related]
3. Tailings dams: Assessing the long-term erosional stability of valley fill designs.
Hancock GR; Coulthard TJ
Sci Total Environ; 2022 Nov; 849():157692. PubMed ID: 35908711
[TBL] [Abstract][Full Text] [Related]
4. Safety assessment of petrochemical enterprise using the cloud model, PHA-LOPA and the bow-tie model.
Xu Q; Xu K; Li L; Yao X
R Soc Open Sci; 2018 Jul; 5(7):180212. PubMed ID: 30109076
[TBL] [Abstract][Full Text] [Related]
5. Research on safety early warning of uranium tailings dam based on abnormal radioactive indexes of water leachate.
Wu X; Hong Y; Chen Z; Zhang T; Ding Y; Chen Y; Lan M
J Environ Radioact; 2023 Jun; 262():107148. PubMed ID: 36921389
[TBL] [Abstract][Full Text] [Related]
6. Seepage stability analysis of geogrid reinforced tailings dam.
Du C; Tao H; Yi F
Sci Rep; 2024 Jan; 14(1):1814. PubMed ID: 38245655
[TBL] [Abstract][Full Text] [Related]
7. Human risk assessment of Panchet Dam in India using TOPSIS and WASPAS Multi-Criteria Decision-Making (MCDM) methods.
Bid S; Siddique G
Heliyon; 2019 Jun; 5(6):e01956. PubMed ID: 31294108
[TBL] [Abstract][Full Text] [Related]
8. A procedure for risk assessment of check dam systems: A case study of Wangmaogou watershed.
Wang L; Zu Q; Zhang Q
PLoS One; 2023; 18(6):e0287750. PubMed ID: 37368886
[TBL] [Abstract][Full Text] [Related]
9. Improving Pallet Mover Safety in the Manufacturing Industry: A Bow-Tie Analysis of Accident Scenarios.
van Nunen K; Swuste P; Reniers G; Paltrinieri N; Aneziris O; Ponnet K
Materials (Basel); 2018 Oct; 11(10):. PubMed ID: 30321999
[TBL] [Abstract][Full Text] [Related]
10. Experimental study on overtopping dam-break of a tailing reservoir under extreme conditions.
Du C; Tao H; Yi F; Cheng C
Environ Sci Pollut Res Int; 2024 Jan; 31(5):6874-6890. PubMed ID: 38153580
[TBL] [Abstract][Full Text] [Related]
11. Seepage field characteristic and stability analysis of tailings dam under action of chemical solution.
Wang G; Hu B; Tian S; Ai M; Liu W; Kong X
Sci Rep; 2021 Feb; 11(1):4073. PubMed ID: 33603058
[TBL] [Abstract][Full Text] [Related]
12. Mine safety assessment based on basic event importance: grey relational analysis and bow tie model.
Xu Q; Xu K; Li L; Yao X
R Soc Open Sci; 2018 Aug; 5(8):180397. PubMed ID: 30225027
[TBL] [Abstract][Full Text] [Related]
13. Use of Basalt Fiber-Reinforced Tailings for Improving the Stability of Tailings Dam.
Zheng B; Zhang D; Liu W; Yang Y; Yang H
Materials (Basel); 2019 Apr; 12(8):. PubMed ID: 31013595
[TBL] [Abstract][Full Text] [Related]
14. Urban Sustainability Evaluation under the Modified TOPSIS Based on Grey Relational Analysis.
Tang J; Zhu HL; Liu Z; Jia F; Zheng XX
Int J Environ Res Public Health; 2019 Jan; 16(2):. PubMed ID: 30658429
[TBL] [Abstract][Full Text] [Related]
15. Sand casting safety assessment for foundry enterprises: fault tree analysis, Heinrich accident triangle, HAZOP-LOPA, bow tie model.
Xu Q; Xu K; Yao X; Zhang J; Wang B
R Soc Open Sci; 2018 Oct; 5(10):180915. PubMed ID: 30473838
[TBL] [Abstract][Full Text] [Related]
16. Probabilistic Analysis of Dam Accidents Worldwide: Risk Assessment for Dams of Different Purposes in OECD and Non-OECD Countries with Focus on Time Trend Analysis.
Kalinina A; Spada M; Burgherr P
Risk Anal; 2020 Sep; 40(9):1723-1743. PubMed ID: 32632936
[TBL] [Abstract][Full Text] [Related]
17. Study on the Evaluation of Emergency Management Capacity of Resilient Communities by the AHP-TOPSIS Method.
Wang K; Wang Z; Deng J; Feng Y; Li Q
Int J Environ Res Public Health; 2022 Dec; 19(23):. PubMed ID: 36498274
[TBL] [Abstract][Full Text] [Related]
18. A Suggested Equivalent Method for a Drainage Structure to Analyze Seepage in Tailings Dam.
Zhang H; Shen Z; Liu D; Xu L; Gan L; Long Y
Materials (Basel); 2022 Oct; 15(20):. PubMed ID: 36295221
[TBL] [Abstract][Full Text] [Related]
19. A Hybrid Multi-Criteria Decision-Making Approach Based on ANP-Entropy TOPSIS for Building Materials Supplier Selection.
Chen CH
Entropy (Basel); 2021 Nov; 23(12):. PubMed ID: 34945903
[TBL] [Abstract][Full Text] [Related]
20. Application Analysis of Radial Basis Function Neural Network Algorithm of Genetic Algorithm for Environmental Restoration and Treatment Effect Evaluation of Decommissioned Uranium Tailings Ponds.
Wei K; Xiong G; Xu Z; Liu Y
Comput Intell Neurosci; 2021; 2021():1650096. PubMed ID: 34868285
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]