These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

108 related articles for article (PubMed ID: 32742737)

  • 1. Analysis of ARMPS2010 database with LaModel and an updated abutment angle equation.
    Tuncay D; Tulu IB; Klemetti T
    Int J Min Sci Technol; 2020 Jan; 30(1):111-118. PubMed ID: 32742737
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Design concerns of room and pillar retreat panels.
    Klemetti TM; Sears MM; Tulu IB
    Int J Min Sci Technol; 2017 Jan; 27(1):29-35. PubMed ID: 28626598
    [TBL] [Abstract][Full Text] [Related]  

  • 3. A case study of the stability of a non-typical bleeder entry system at a U.S. longwall mine.
    Klemetti TM; Van Dyke MA; Tulu IB; Tuncay D
    Int J Min Sci Technol; 2020 Jan; 30(1):25-31. PubMed ID: 32742736
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Influence of longwall mining on the stability of gas wells in chain pillars.
    Zhang P; Dougherty H; Su D; Trackemas J; Tulu B
    Int J Min Sci Technol; 2020; 30(1):3-9. PubMed ID: 32341807
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams.
    Zhang P; Tulu B; Sears M; Trackemas J
    Int J Min Sci Technol; 2018 Jan; 28(1):21-27. PubMed ID: 29423329
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Coal rib response during bench mining: A case study.
    Sears MM; Rusnak J; Van Dyke M; Rashed G; Mohamed K; Sloan M
    Int J Min Sci Technol; 2018 Jan; 28(1):107-113. PubMed ID: 29862125
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Moderate Cover Bleeder Entry and Standing Support Performance in a Longwall Mine: a Case Study.
    Van Dyke MA; Klemetti TM; Tulu IB; Tuncay D
    Min Metall Explor; 2021; 38(2):885-896. PubMed ID: 35837439
    [TBL] [Abstract][Full Text] [Related]  

  • 8. A Case Study of the Collapse of Slender Pillars Affected by Through-Going Discontinuities at a Limestone Mine in Pennsylvania.
    Esterhuizen GS; Tyrna PL; Murphy MM
    Rock Mech Rock Eng; 2019 Sep; 52(12):4941-4952. PubMed ID: 35923870
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Long-Term Stability of a 13.7 × 30.5-m (45 × 100-ft) Undercut Span Beneath Cemented Rockfill at the Turquoise Ridge Mine, Nevada.
    Seymour JB; Martin LA; Raffaldi MJ; Warren SN; Sandbak LA
    Rock Mech Rock Eng; 2019; 2019():1-17. PubMed ID: 31749517
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Reasonable coal pillar design and remote control mining technology for highwall residual coal resources.
    Wang F; Zhang C
    R Soc Open Sci; 2019 Apr; 6(4):181817. PubMed ID: 31183120
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Research on stress release for the gob-side roadway using the roof-cutting technology with a chainsaw arm.
    Tai Y; Yu B; Xia B; Li Z; Xia H
    R Soc Open Sci; 2020 Mar; 7(3):191663. PubMed ID: 32269797
    [TBL] [Abstract][Full Text] [Related]  

  • 12. The pressure relief protection effect of different strip widths, dip angles and pillar widths of an underside protective seam.
    Fang S; Zhu H; Huo Y; Zhang Y; Wang H; Li F; Wang X
    PLoS One; 2021; 16(1):e0246199. PubMed ID: 33507939
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Destabilization and energy characteristics of coal pillar in roadway driving along gob based on rockburst risk assessment.
    Xue Y; Cao Z; Shen W
    R Soc Open Sci; 2019 Jul; 6(7):190094. PubMed ID: 31417716
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Investigation and Stability Assessment of Three Sill Pillar Recovery Schemes in a Hard Rock Mine.
    Xu H; Apel DB; Wang J; Wei C; Skrzypkowski K
    Energies (Basel); 2022 May; 15(10):3797. PubMed ID: 35911128
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Deep cover bleeder entry performance and support loading: A case study.
    Klemetti TM; Van Dyke MA; Tulu IB
    Int J Min Sci Technol; 2018 Jan; 28(1):85-93. PubMed ID: 30687559
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Stability Risk Assessment of Underground Rock Pillars Using Logistic Model Trees.
    Li N; Zare M; Yi C; Jimenez R
    Int J Environ Res Public Health; 2022 Feb; 19(4):. PubMed ID: 35206322
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Vertical stress and stability of interburden over an abandoned pillar working before upward mining: a case study.
    Bai J; Feng G; Wang S; Qi T; Yang J; Guo J; Li Z; Du X; Wang Z; Du Y; Zhang Y
    R Soc Open Sci; 2018 Aug; 5(8):180346. PubMed ID: 30225022
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Estimation of the height of complete groundwater drainage above mined longwall panels.
    Tammetta P
    Ground Water; 2013; 51(5):723-34. PubMed ID: 23206210
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Acid-base accounting to predict post-mining drainage quality on surface mines.
    Skousen J; Simmons J; McDonald LM; Ziemkiewicz P
    J Environ Qual; 2002; 31(6):2034-44. PubMed ID: 12469854
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Analysis of gob gas venthole production performances for strata gas control in longwall mining.
    Karacan CÖ
    Int J Rock Mech Min Sci (1997); 2015 Oct; 79():9-18. PubMed ID: 29606899
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 6.