119 related articles for article (PubMed ID: 34014476)
1. Modeling and optimization for noise-aversion and energy-awareness disassembly sequence planning problems in reverse supply chain.
Liang P; Fu Y; Ni S; Zheng B
Environ Sci Pollut Res Int; 2021 May; ():. PubMed ID: 34014476
[TBL] [Abstract][Full Text] [Related]
2. Modeling and scheduling for remanufacturing systems with disassembly, reprocessing, and reassembly considering total energy consumption.
Wang W; Tian G; Zhang H; Xu K; Miao Z
Environ Sci Pollut Res Int; 2021 Nov; ():. PubMed ID: 34767174
[TBL] [Abstract][Full Text] [Related]
3. Disassembly sequence planning of waste auto parts.
Mao J; Hong D; Chen Z; Changhai M; Weiwen L; Wang J
J Air Waste Manag Assoc; 2021 May; 71(5):607-619. PubMed ID: 33395564
[TBL] [Abstract][Full Text] [Related]
4. Application and planning of an energy-oriented stochastic disassembly line balancing problem.
Zhang X; Zhou H; Fu C; Mi M; Zhan C; Pham DT; Fathollahi-Fard AM
Environ Sci Pollut Res Int; 2023 May; ():1-15. PubMed ID: 37222888
[TBL] [Abstract][Full Text] [Related]
5. Hybrid evolutionary algorithm for stochastic multiobjective disassembly line balancing problem in remanufacturing.
Tian G; Zhang X; Fathollahi-Fard AM; Jiang Z; Zhang C; Yuan G; Pham DT
Environ Sci Pollut Res Int; 2023 Apr; ():. PubMed ID: 37118384
[TBL] [Abstract][Full Text] [Related]
6. Environment-oriented disassembly planning for end-of-life vehicle batteries based on an improved northern goshawk optimisation algorithm.
Zhan C; Zhang X; Tian G; Pham DT; Ivanov M; Aleksandrov A; Fu C; Zhang J; Wu Z
Environ Sci Pollut Res Int; 2023 Apr; 30(16):47956-47971. PubMed ID: 36746861
[TBL] [Abstract][Full Text] [Related]
7. Lexicographic Multiobjective Scatter Search for the Optimization of Sequence-Dependent Selective Disassembly Subject to Multiresource Constraints.
Guo X; Zhou M; Liu S; Qi L
IEEE Trans Cybern; 2020 Jul; 50(7):3307-3317. PubMed ID: 30932856
[TBL] [Abstract][Full Text] [Related]
8. A heuristic for disassembly planning in remanufacturing system.
Sung J; Jeong B
ScientificWorldJournal; 2014; 2014():949527. PubMed ID: 24895679
[TBL] [Abstract][Full Text] [Related]
9. Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm.
Yuan G; Yang Y; Tian G; Fathollahi-Fard AM
Environ Sci Pollut Res Int; 2022 Jan; ():. PubMed ID: 35099698
[TBL] [Abstract][Full Text] [Related]
10. A Discrete Artificial Bee Colony Algorithm for Multiobjective Disassembly Line Balancing of End-of-Life Products.
Wang K; Li X; Gao L; Li P; Sutherland JW
IEEE Trans Cybern; 2022 Aug; 52(8):7415-7426. PubMed ID: 33400674
[TBL] [Abstract][Full Text] [Related]
11. Disassembly Sequence Optimization for Large-Scale Products With Multiresource Constraints Using Scatter Search and Petri Nets.
Guo X; Liu S; Zhou M; Tian G
IEEE Trans Cybern; 2016 Nov; 46(11):2435-2446. PubMed ID: 26469851
[TBL] [Abstract][Full Text] [Related]
12. Environment and economic analysis of reverse supply chain scenarios for remanufacturing using discrete-event simulation approach.
Ravichandran M; Vimal KEK; Kumar V; Kulkarni O; Govindaswamy S; Kandasamy J
Environ Dev Sustain; 2023 Mar; ():1-42. PubMed ID: 37363015
[TBL] [Abstract][Full Text] [Related]
13. A Novel Simulated Annealing-Based Hyper-Heuristic Algorithm for Stochastic Parallel Disassembly Line Balancing in Smart Remanufacturing.
Hu Y; Liu C; Zhang M; Jia Y; Xu Y
Sensors (Basel); 2023 Feb; 23(3):. PubMed ID: 36772690
[TBL] [Abstract][Full Text] [Related]
14. Modeling and solving the parallel mixed-flow remanufacturing disassembly line balancing problem for multi-variety products.
Yu G; Zhang X; Meng W
Sci Rep; 2022 Sep; 12(1):15383. PubMed ID: 36100695
[TBL] [Abstract][Full Text] [Related]
15. A Predictive Approach for Disassembly Line Balancing Problems.
Paprocka I; Skołud B
Sensors (Basel); 2022 May; 22(10):. PubMed ID: 35632329
[TBL] [Abstract][Full Text] [Related]
16. A remanufacturing supply chain network with differentiated new and remanufactured products considering consumer preference, production capacity constraint and government regulation.
Zhang X; Zhou G; Cao J; Lu J
PLoS One; 2023; 18(8):e0289349. PubMed ID: 37561709
[TBL] [Abstract][Full Text] [Related]
17. On the optimal design of the disassembly and recovery processes.
Xanthopoulos A; Iakovou E
Waste Manag; 2009 May; 29(5):1702-11. PubMed ID: 19138507
[TBL] [Abstract][Full Text] [Related]
18. Modeling and Balancing for Disassembly Lines Considering Workers With Different Efficiencies.
Wang K; Li X; Gao L; Li P
IEEE Trans Cybern; 2022 Nov; 52(11):11758-11771. PubMed ID: 34033556
[TBL] [Abstract][Full Text] [Related]
19. A new uncertain remanufacturing scheduling model with rework risk using hybrid optimization algorithm.
Zhang W; Wang J; Liu X; Zhang S
Environ Sci Pollut Res Int; 2023 May; 30(22):62744-62761. PubMed ID: 36944839
[TBL] [Abstract][Full Text] [Related]
20. Towards sustainable water resources planning and pollution control: Inexact joint-probabilistic double-sided stochastic chance-constrained programming model.
Zhang C; Guo S; Zhang F; Engel BA; Guo P
Sci Total Environ; 2019 Mar; 657():73-86. PubMed ID: 30530221
[TBL] [Abstract][Full Text] [Related]
[Next] [New Search]