These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

119 related articles for article (PubMed ID: 36127381)

  • 1. Collaborative variable neighborhood search for multi-objective distributed scheduling in two-stage hybrid flow shop with sequence-dependent setup times.
    Cai J; Lu S; Cheng J; Wang L; Gao Y; Tan T
    Sci Rep; 2022 Sep; 12(1):15724. PubMed ID: 36127381
    [TBL] [Abstract][Full Text] [Related]  

  • 2. A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold.
    Lei D; Li M; Wang L
    IEEE Trans Cybern; 2019 Mar; 49(3):1097-1109. PubMed ID: 29994437
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Energy-efficient distributed heterogeneous re-entrant hybrid flow shop scheduling problem with sequence dependent setup times considering factory eligibility constraints.
    Geng K; Liu L; Wu Z
    Sci Rep; 2022 Nov; 12(1):18741. PubMed ID: 36335209
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.
    Yue L; Guan Z; Saif U; Zhang F; Wang H
    Springerplus; 2016; 5(1):1593. PubMed ID: 27652166
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization.
    Huang S; Tian N; Wang Y; Ji Z
    Springerplus; 2016; 5(1):1432. PubMed ID: 27652008
    [TBL] [Abstract][Full Text] [Related]  

  • 6. A Hybrid Evolutionary Algorithm Using Two Solution Representations for Hybrid Flow-Shop Scheduling Problem.
    Fan J; Li Y; Xie J; Zhang C; Shen W; Gao L
    IEEE Trans Cybern; 2023 Mar; 53(3):1752-1764. PubMed ID: 34710048
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Distributed Heterogeneous Co-Evolutionary Algorithm for Scheduling a Multistage Fine-Manufacturing System With Setup Constraints.
    Zhang G; Liu B; Wang L; Xing K
    IEEE Trans Cybern; 2024 Mar; 54(3):1497-1510. PubMed ID: 36327177
    [TBL] [Abstract][Full Text] [Related]  

  • 8. Multi-stage hybrid evolutionary algorithm for multiobjective distributed fuzzy flow-shop scheduling problem.
    Zhang W; Zhang X; Hao X; Gen M; Zhang G; Yang W
    Math Biosci Eng; 2023 Jan; 20(3):4838-4864. PubMed ID: 36896525
    [TBL] [Abstract][Full Text] [Related]  

  • 9. A global-local neighborhood search algorithm and tabu search for flexible job shop scheduling problem.
    Escamilla Serna NJ; Seck-Tuoh-Mora JC; Medina-Marin J; Hernandez-Romero N; Barragan-Vite I; Corona Armenta JR
    PeerJ Comput Sci; 2021; 7():e574. PubMed ID: 34141895
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Multiobjective particle swarm optimization with direction search and differential evolution for distributed flow-shop scheduling problem.
    Zhang W; Li C; Gen M; Yang W; Zhang Z; Zhang G
    Math Biosci Eng; 2022 Jun; 19(9):8833-8865. PubMed ID: 35942738
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Hybrid metaheuristics for solving a fuzzy single batch-processing machine scheduling problem.
    Molla-Alizadeh-Zavardehi S; Tavakkoli-Moghaddam R; Lotfi FH
    ScientificWorldJournal; 2014; 2014():214615. PubMed ID: 24883359
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Efficient bounding schemes for the two-center hybrid flow shop scheduling problem with removal times.
    Hidri L; Gharbi A; Louly MA
    ScientificWorldJournal; 2014; 2014():605198. PubMed ID: 25610911
    [TBL] [Abstract][Full Text] [Related]  

  • 13. A Two-Stage Cooperative Evolutionary Algorithm With Problem-Specific Knowledge for Energy-Efficient Scheduling of No-Wait Flow-Shop Problem.
    Zhao F; He X; Wang L
    IEEE Trans Cybern; 2021 Nov; 51(11):5291-5303. PubMed ID: 33095728
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Hybrid Self-Adaptive Evolution Strategies Guided by Neighborhood Structures for Combinatorial Optimization Problems.
    Coelho VN; Coelho IM; Souza MJ; Oliveira TA; Cota LP; Haddad MN; Mladenovic N; Silva RC; GuimarĂ£es FG
    Evol Comput; 2016; 24(4):637-666. PubMed ID: 27258842
    [TBL] [Abstract][Full Text] [Related]  

  • 15. An improved multi-objective imperialist competitive algorithm for surgical case scheduling problem with switching and preparation times.
    Yu H; Li JQ; Chen XL; Niu W; Sang HY
    Cluster Comput; 2022; 25(5):3591-3616. PubMed ID: 35431616
    [TBL] [Abstract][Full Text] [Related]  

  • 16. A Knowledge-Based Two-Population Optimization Algorithm for Distributed Energy-Efficient Parallel Machines Scheduling.
    Pan Z; Lei D; Wang L
    IEEE Trans Cybern; 2022 Jun; 52(6):5051-5063. PubMed ID: 33119528
    [TBL] [Abstract][Full Text] [Related]  

  • 17. An Improved African Vulture Optimization Algorithm for Dual-Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problems.
    He Z; Tang B; Luan F
    Sensors (Basel); 2022 Dec; 23(1):. PubMed ID: 36616686
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Iterated Local Search and Other Algorithms for Buffered Two-Machine Permutation Flow Shops with Constant Processing Times on One Machine.
    Le HT; Geser P; Middendorf M
    Evol Comput; 2021 Sep; 29(3):415-439. PubMed ID: 34467994
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times.
    Ezugwu AE; Adeleke OJ; Viriri S
    PLoS One; 2018; 13(7):e0200030. PubMed ID: 29975783
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Hybrid Artificial Bee Colony Algorithm for a Parallel Batching Distributed Flow-Shop Problem With Deteriorating Jobs.
    Li JQ; Song MX; Wang L; Duan PY; Han YY; Sang HY; Pan QK
    IEEE Trans Cybern; 2020 Jun; 50(6):2425-2439. PubMed ID: 31603832
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 6.