These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

163 related articles for article (PubMed ID: 36944839)

  • 1. A new uncertain remanufacturing scheduling model with rework risk using hybrid optimization algorithm.
    Zhang W; Wang J; Liu X; Zhang S
    Environ Sci Pollut Res Int; 2023 May; 30(22):62744-62761. PubMed ID: 36944839
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm.
    Yuan G; Yang Y; Tian G; Fathollahi-Fard AM
    Environ Sci Pollut Res Int; 2022 Jan; ():. PubMed ID: 35099698
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Modeling and scheduling for remanufacturing systems with disassembly, reprocessing, and reassembly considering total energy consumption.
    Wang W; Tian G; Zhang H; Xu K; Miao Z
    Environ Sci Pollut Res Int; 2021 Nov; ():. PubMed ID: 34767174
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Hybrid evolutionary algorithm for stochastic multiobjective disassembly line balancing problem in remanufacturing.
    Tian G; Zhang X; Fathollahi-Fard AM; Jiang Z; Zhang C; Yuan G; Pham DT
    Environ Sci Pollut Res Int; 2023 Apr; ():. PubMed ID: 37118384
    [TBL] [Abstract][Full Text] [Related]  

  • 5. An integrated approach for remanufacturing job shop scheduling with routing alternatives.
    Li LL; Li CB; Li L; Tang Y; Yang QS
    Math Biosci Eng; 2019 Mar; 16(4):2063-2085. PubMed ID: 31137200
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Design and Application of Vague Set Theory and Adaptive Grid Particle Swarm Optimization Algorithm in Resource Scheduling Optimization.
    Han Y; Han P; Yuan B; Zhang Z; Liu L; Panneerselvam J
    J Grid Comput; 2023; 21(2):24. PubMed ID: 37089625
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Modeling and solving the parallel mixed-flow remanufacturing disassembly line balancing problem for multi-variety products.
    Yu G; Zhang X; Meng W
    Sci Rep; 2022 Sep; 12(1):15383. PubMed ID: 36100695
    [TBL] [Abstract][Full Text] [Related]  

  • 8. The Hot Strip Mill Scheduling Problem With Uncertainty: Robust Optimization Models and Solution Approaches.
    Zhang R; Song S; Wu C
    IEEE Trans Cybern; 2023 Jul; 53(7):4079-4093. PubMed ID: 34990375
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization.
    Mousavi M; Yap HJ; Musa SN; Tahriri F; Md Dawal SZ
    PLoS One; 2017; 12(3):e0169817. PubMed ID: 28263994
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Multiobjective particle swarm optimization with direction search and differential evolution for distributed flow-shop scheduling problem.
    Zhang W; Li C; Gen M; Yang W; Zhang Z; Zhang G
    Math Biosci Eng; 2022 Jun; 19(9):8833-8865. PubMed ID: 35942738
    [TBL] [Abstract][Full Text] [Related]  

  • 11. An energy and time prediction model for remanufacturing process using graphical evaluation and review technique (GERT) with multivariant uncertainties.
    Zhao J; Xue Z; Li T; Ping J; Peng S
    Environ Sci Pollut Res Int; 2021 Apr; ():. PubMed ID: 33847893
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Energy-Efficient Adaptive Sensing Scheduling in Wireless Sensor Networks Using Fibonacci Tree Optimization Algorithm.
    Wu L; Cai H
    Sensors (Basel); 2021 Jul; 21(15):. PubMed ID: 34372239
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Hybrid particle swarm optimization for hybrid flowshop scheduling problem with maintenance activities.
    Li JQ; Pan QK; Mao K
    ScientificWorldJournal; 2014; 2014():596850. PubMed ID: 24883414
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Disassembly sequence planning of waste auto parts.
    Mao J; Hong D; Chen Z; Changhai M; Weiwen L; Wang J
    J Air Waste Manag Assoc; 2021 May; 71(5):607-619. PubMed ID: 33395564
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Remanufacturing an evaluation system for electrical control systems of drilling rig based on the improved FCE and ANN.
    Dong X; Zhang Z; Sun J; Luo Z
    PLoS One; 2022; 17(5):e0268788. PubMed ID: 35613125
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Optimising remanufacturing decision-making using the bees algorithm in product digital twins.
    Kerin M; Hartono N; Pham DT
    Sci Rep; 2023 Jan; 13(1):701. PubMed ID: 36639730
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Research on Distributed Multi-Sensor Cooperative Scheduling Model Based on Partially Observable Markov Decision Process.
    Zhang Z; Wu J; Zhao Y; Luo R
    Sensors (Basel); 2022 Apr; 22(8):. PubMed ID: 35458985
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm.
    Peng JL; Liu X; Peng C; Shao Y
    Sci Rep; 2023 Oct; 13(1):18502. PubMed ID: 37898683
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.
    Xu J; Feng C
    ScientificWorldJournal; 2014; 2014():463692. PubMed ID: 24550708
    [TBL] [Abstract][Full Text] [Related]  

  • 20. Economic Optimal Allocation of Mine Water Based on Two-Stage Adaptive Genetic Algorithm and Particle Swarm Optimization.
    Zhang Z; Liu Y; Bo L; Yue Y; Wang Y
    Sensors (Basel); 2022 Jan; 22(3):. PubMed ID: 35161630
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 9.