These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

118 related articles for article (PubMed ID: 38167561)

  • 1. Research on sustainable collaborative scheduling problem of multi-stage mixed flow shop for crankshaft components.
    Nie L; Zhang Q; Feng M; Qin J
    Sci Rep; 2024 Jan; 14(1):209. PubMed ID: 38167561
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Minimizing the makespan and carbon emissions in the green flexible job shop scheduling problem with learning effects.
    Li Z; Chen Y
    Sci Rep; 2023 Apr; 13(1):6369. PubMed ID: 37076558
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Distributed shop scheduling: A comprehensive review on classifications, models and algorithms.
    Duan J; Wang M; Zhang Q; Qin J
    Math Biosci Eng; 2023 Jul; 20(8):15265-15308. PubMed ID: 37679180
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Environment-Aware Production Schedulingfor Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach.
    Zhang R
    Int J Environ Res Public Health; 2017 Dec; 15(1):. PubMed ID: 29295603
    [TBL] [Abstract][Full Text] [Related]  

  • 5. Multi-resource collaborative scheduling problem of automated terminal considering the AGV charging effect under COVID-19.
    Sun B; Zhai G; Li S; Pei B
    Ocean Coast Manag; 2023 Feb; 232():106422. PubMed ID: 36407122
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Proactive Scheduling for Job-Shop Based on Abnormal Event Monitoring of Workpieces and Remaining Useful Life Prediction of Tools in Wisdom Manufacturing Workshop.
    Zhang C; Yao X; Tan W; Zhang Y; Zhang F
    Sensors (Basel); 2019 Nov; 19(23):. PubMed ID: 31795368
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Multilayer Game Collaborative Optimization Based on Elman Neural Network System Diagnosis in Shared Manufacturing Mode.
    Tang Q; Wu B
    Comput Intell Neurosci; 2022; 2022():6135970. PubMed ID: 36193187
    [TBL] [Abstract][Full Text] [Related]  

  • 8. An improved memetic algorithm to solve the energy-efficient distributed flexible job shop scheduling problem with transportation and start-stop constraints.
    Gu Y; Xu H; Yang J; Li R
    Math Biosci Eng; 2023 Dec; 20(12):21467-21498. PubMed ID: 38124606
    [TBL] [Abstract][Full Text] [Related]  

  • 9. A Multiobjective Optimization Model for a Dynamic and Sustainable Cellular Manufacturing System under Uncertainty.
    Jafarzadeh J; Amoozad Khalili H; Shoja N
    Comput Intell Neurosci; 2022; 2022():1334081. PubMed ID: 36188713
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times.
    Yang X; Zeng Z; Wang R; Sun X
    PLoS One; 2016; 11(12):e0167427. PubMed ID: 27907163
    [TBL] [Abstract][Full Text] [Related]  

  • 11. A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling.
    Rego MF; Pinto JCEM; Cota LP; Souza MJF
    PeerJ Comput Sci; 2022; 8():e844. PubMed ID: 35494814
    [TBL] [Abstract][Full Text] [Related]  

  • 12. Multi-objective sustainable supply chain network optimization based on chaotic particle-Ant colony algorithm.
    Zhang T; Xie W; Wei M; Xie X
    PLoS One; 2023; 18(7):e0278814. PubMed ID: 37428738
    [TBL] [Abstract][Full Text] [Related]  

  • 13. Modeling and optimization of bakery production scheduling to minimize makespan and oven idle time.
    Babor M; Paquet-Durand O; Kohlus R; Hitzmann B
    Sci Rep; 2023 Jan; 13(1):235. PubMed ID: 36604451
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Solving flexible job shop scheduling problems with transportation time based on improved genetic algorithm.
    Zhang GH; Sun JH; Liu X; Wang GD; Yang YY
    Math Biosci Eng; 2019 Feb; 16(3):1334-1347. PubMed ID: 30947423
    [TBL] [Abstract][Full Text] [Related]  

  • 15. A multi-objective scheduling method for operational coordination time using improved triangular fuzzy number representation.
    Zhao L; Wang B; Shen C
    PLoS One; 2021; 16(6):e0252293. PubMed ID: 34106963
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Integrating sustainability into production scheduling in hybrid flow-shop environments.
    Mokhtari-Moghadam A; Pourhejazy P; Gupta D
    Environ Sci Pollut Res Int; 2023 Apr; ():. PubMed ID: 37095210
    [TBL] [Abstract][Full Text] [Related]  

  • 17. Day Surgery Scheduling and Optimization in Large Public Hospitals in China: A Three-Station Job Shop Scheduling Problem.
    Bai X; Zhang W; Luo L; Ma H; Zhu T
    J Healthc Eng; 2022; 2022():1149657. PubMed ID: 35942045
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Capacitated multi-objective disassembly scheduling with fuzzy processing time via a fruit fly optimization algorithm.
    Yuan G; Yang Y; Tian G; Fathollahi-Fard AM
    Environ Sci Pollut Res Int; 2022 Jan; ():. PubMed ID: 35099698
    [TBL] [Abstract][Full Text] [Related]  

  • 19. Dynamic Production Control and Optimization under Low Carbon Economy considering Delivery Time Demand.
    Liu M; Yang T; Li Q
    Comput Intell Neurosci; 2022; 2022():4535383. PubMed ID: 35637728
    [TBL] [Abstract][Full Text] [Related]  

  • 20. An improved MOPSO algorithm for multi-objective optimization of reservoir operation under climate change.
    Mansouri M; Safavi HR; Rezaei F
    Environ Monit Assess; 2022 Mar; 194(4):261. PubMed ID: 35257239
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 6.