These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


BIOMARKERS

Molecular Biopsy of Human Tumors

- a resource for Precision Medicine *

117 related articles for article (PubMed ID: 38905191)

  • 1. Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints.
    Muñoz-Sánchez R; Martínez-Salazar I; González-Velarde JL; Ríos Solís YÁ
    PLoS One; 2024; 19(6):e0304119. PubMed ID: 38905191
    [TBL] [Abstract][Full Text] [Related]  

  • 2. Hybrid metaheuristics for solving a fuzzy single batch-processing machine scheduling problem.
    Molla-Alizadeh-Zavardehi S; Tavakkoli-Moghaddam R; Lotfi FH
    ScientificWorldJournal; 2014; 2014():214615. PubMed ID: 24883359
    [TBL] [Abstract][Full Text] [Related]  

  • 3. Environment-Aware Production Schedulingfor Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach.
    Zhang R
    Int J Environ Res Public Health; 2017 Dec; 15(1):. PubMed ID: 29295603
    [TBL] [Abstract][Full Text] [Related]  

  • 4. Effective social spider optimization algorithms for distributed assembly permutation flowshop scheduling problem in automobile manufacturing supply chain.
    Zhang W; Hao J; Liu F
    Sci Rep; 2024 Mar; 14(1):6370. PubMed ID: 38493263
    [TBL] [Abstract][Full Text] [Related]  

  • 5. A Heuristic-Based Adaptive Iterated Greedy Algorithm for Lot-Streaming Hybrid Flow Shop Scheduling Problem with Consistent and Intermingled Sub-Lots.
    Lu Y; Tang Q; Pan Q; Zhao L; Zhu Y
    Sensors (Basel); 2023 Mar; 23(5):. PubMed ID: 36905012
    [TBL] [Abstract][Full Text] [Related]  

  • 6. Modeling and optimization of bakery production scheduling to minimize makespan and oven idle time.
    Babor M; Paquet-Durand O; Kohlus R; Hitzmann B
    Sci Rep; 2023 Jan; 13(1):235. PubMed ID: 36604451
    [TBL] [Abstract][Full Text] [Related]  

  • 7. Hybrid Artificial Bee Colony Algorithm for a Parallel Batching Distributed Flow-Shop Problem With Deteriorating Jobs.
    Li JQ; Song MX; Wang L; Duan PY; Han YY; Sang HY; Pan QK
    IEEE Trans Cybern; 2020 Jun; 50(6):2425-2439. PubMed ID: 31603832
    [TBL] [Abstract][Full Text] [Related]  

  • 8. A product-driven system with an evolutionary algorithm to increase flexibility in planning a job shop.
    Sáez P; Herrera C; Booth C; Belmokhtar-Berraf S; Parada V
    PLoS One; 2023; 18(2):e0281807. PubMed ID: 36795712
    [TBL] [Abstract][Full Text] [Related]  

  • 9. Minimizing the makespan and carbon emissions in the green flexible job shop scheduling problem with learning effects.
    Li Z; Chen Y
    Sci Rep; 2023 Apr; 13(1):6369. PubMed ID: 37076558
    [TBL] [Abstract][Full Text] [Related]  

  • 10. Single machine scheduling problems with sequence-dependent setup times and precedence delays.
    Lin SW; Ying KC
    Sci Rep; 2022 Jun; 12(1):9430. PubMed ID: 35676306
    [TBL] [Abstract][Full Text] [Related]  

  • 11. Research of Flexible Assembly Job-Shop Batch-Scheduling Problem Based on Improved Artificial Bee Colony.
    Li X; Lu J; Yang C; Wang J
    Front Bioeng Biotechnol; 2022; 10():909548. PubMed ID: 36051590
    [TBL] [Abstract][Full Text] [Related]  

  • 12. An Improved Genetic Algorithm for Solving the Multi-AGV Flexible Job Shop Scheduling Problem.
    Meng L; Cheng W; Zhang B; Zou W; Fang W; Duan P
    Sensors (Basel); 2023 Apr; 23(8):. PubMed ID: 37112156
    [TBL] [Abstract][Full Text] [Related]  

  • 13. An Effective Cooperative Co-Evolutionary Algorithm for Distributed Flowshop Group Scheduling Problems.
    Pan QK; Gao L; Wang L
    IEEE Trans Cybern; 2022 Jul; 52(7):5999-6012. PubMed ID: 33373315
    [TBL] [Abstract][Full Text] [Related]  

  • 14. Solving flexible job shop scheduling problems with transportation time based on improved genetic algorithm.
    Zhang GH; Sun JH; Liu X; Wang GD; Yang YY
    Math Biosci Eng; 2019 Feb; 16(3):1334-1347. PubMed ID: 30947423
    [TBL] [Abstract][Full Text] [Related]  

  • 15. Greedy Firefly Algorithm for Optimizing Job Scheduling in IoT Grid Computing.
    Yousif A; Alqhtani SM; Bashir MB; Ali A; Hamza R; Hassan A; Tawfeeg TM
    Sensors (Basel); 2022 Jan; 22(3):. PubMed ID: 35161596
    [TBL] [Abstract][Full Text] [Related]  

  • 16. Efficient bounding schemes for the two-center hybrid flow shop scheduling problem with removal times.
    Hidri L; Gharbi A; Louly MA
    ScientificWorldJournal; 2014; 2014():605198. PubMed ID: 25610911
    [TBL] [Abstract][Full Text] [Related]  

  • 17. A novel method-based reinforcement learning with deep temporal difference network for flexible double shop scheduling problem.
    Wang X; Zhong P; Liu M; Zhang C; Yang S
    Sci Rep; 2024 Apr; 14(1):9047. PubMed ID: 38641689
    [TBL] [Abstract][Full Text] [Related]  

  • 18. Collaborative variable neighborhood search for multi-objective distributed scheduling in two-stage hybrid flow shop with sequence-dependent setup times.
    Cai J; Lu S; Cheng J; Wang L; Gao Y; Tan T
    Sci Rep; 2022 Sep; 12(1):15724. PubMed ID: 36127381
    [TBL] [Abstract][Full Text] [Related]  

  • 19. A Hybrid Evolutionary Algorithm Using Two Solution Representations for Hybrid Flow-Shop Scheduling Problem.
    Fan J; Li Y; Xie J; Zhang C; Shen W; Gao L
    IEEE Trans Cybern; 2023 Mar; 53(3):1752-1764. PubMed ID: 34710048
    [TBL] [Abstract][Full Text] [Related]  

  • 20. On the Fine-grained Parameterized Complexity of Partial Scheduling to Minimize the Makespan.
    Nederlof J; Swennenhuis CMF
    Algorithmica; 2022; 84(8):2309-2334. PubMed ID: 35880200
    [TBL] [Abstract][Full Text] [Related]  

    [Next]    [New Search]
    of 6.