These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.
Pubmed for Handhelds
PUBMED FOR HANDHELDS
Search MEDLINE/PubMed
Title: Development of a groundwater biobarrier for the removal of polycyclic aromatic hydrocarbons, BTEX, and heterocyclic hydrocarbons. Author: Tiehm A, Müller A, Alt S, Jacob H, Schad H, Weingran C. Journal: Water Sci Technol; 2008; 58(7):1349-55. PubMed ID: 18957746. Abstract: A full scale funnel-and-gate biobarrier has been developed for the removal of tar oil pollutants at an abandoned tar factory site near the city of Offenbach, Germany. Laboratory and on-site column studies were done to determine the operation parameters for microbiological clean-up of the groundwater polluted with 12,000 microg/L mono- aromatic hydrocarbons such as benzene and the xylenes, 4,800 microg/L polycyclic aromatic hydrocarbons such as naphthalene and acenaphthene, and 4,700 microg/L heterocyclic aromatic hydrocarbons such as benzofuran and benzothiophene. In the laboratory study, a residence time of approx. 70 h proved to be sufficient for aerobic pollutant biodegradation. Up to 180 mg/L H(2)O(2) were added and did not lead to any toxic effects to the degrading bacteria. The feasibility of the concept was confirmed in an on-site pilot study performed with a sedimentation tank (removal of ferric iron) and two bioreactors. In the bioreactors, >99.3% of the pollutants were degraded. Biodegradation activity corresponded to a significant increase in numbers of pollutant degrading bacteria. In the bioreactors, a fast dissociation of H(2)O(2) was observed resulting in losses of oxygen and temporary gas clogging. Therefore, a repeated addition of moderate concentrations of H(2)O(2) proved to be more favourable than the addition of high concentrations at a single dosing port. The full scale biobarrier consists of three separated bioreactors thus enabling extended control and access to the reactors. The operation of the funnel-and-gate biobarrier started in April 2007, and represents the first biological permeable reactive barrier with extended control (EC-PRB) in Germany.[Abstract] [Full Text] [Related] [New Search]