These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


PUBMED FOR HANDHELDS

Search MEDLINE/PubMed


  • Title: Polyurethane rotating disc system for post-treatment of anaerobically pre-treated sewage.
    Author: Tawfik A, Klapwijk A.
    Journal: J Environ Manage; 2010 May; 91(5):1183-92. PubMed ID: 20138699.
    Abstract:
    The performance of polyurethane rotating discs (RBC-1) versus polystyrene rotating discs (RBC-2) for the treatment of an up-flow anaerobic sludge blanket (UASB) reactor effluent fed with domestic wastewater was investigated. Both RBC units were operated at the same organic loading rate (OLR) of 10.5 gCOD/m(2) d. and a hydraulic retention time (HRT) of 2.5 h. The residual values of COD fractions (COD(suspended), COD(colloidal) and COD(soluble)) in the treated effluent of RBC-1 and RBC-2 were similar. However, the removal efficiency of ammonia in the RBC-1 (87 +/- 4%) was significantly higher than that found for RBC-2 i.e. 24 +/- 6%. Moreover, RBC-1 achieved a substantial removal efficiency of 99.0 +/- 1% for Escherichia coli (E. coli), while RBC-2 removed 91.2 +/- 0.3%. Based on these results, optimization of RBC-1 treating UASB reactor effluent was extensively performed. The RBC-1 was operated at an OLR's of 4.0, 11 and 23 gCOD/m(2) d. The results obtained showed that increasing the OLR from 11.0 to 23.0 gCOD/m(2) d and decreasing the HRT from 2.5 to 1.25 h significantly declined the effluent quality of COD(total) and ammonia. However, the residual values of COD(total) and ammonia remained unaffected when increasing the OLR from 4.0 to 11.0 gCOD/m(2) d and by decreasing the HRT from 5 to 2.5 h. Bacteriological examination showed that the mean residual count of E. coli remained at a level of 10(4)/100 ml, in the effluent of RBC-1 independent on the imposed HRT. Accordingly, it is recommended to operate RBC-1 for treatment of anaerobically pre-treated sewage at an OLR of 11 gCOD/m(2) d and an HRT of 2.5 h. A feed-less (ammonia limitation) period of 9.0 days followed by 9.0 days feeding with high OLR of 26 gCOD/m(2) d. (raw sewage) was investigated to elaborate, if the nitrifiers of the RBC-1 are capable to convert ammonia to nitrate after totally 18 days when retuning back to the normal operating conditions. The results of the experiment clearly show a strong and immediate detrimental effect of imposing high OLR of 26 gCOD/m(2) d on the nitrification process in the nitrifying RBC unit. However, after returning back to the original OLR of 10.6 gCOD/m(2) d, the nitrification efficiency in the RBC unit was recovered within 2-3 days.
    [Abstract] [Full Text] [Related] [New Search]