These tools will no longer be maintained as of December 31, 2024. Archived website can be found here. PubMed4Hh GitHub repository can be found here. Contact NLM Customer Service if you have questions.


PUBMED FOR HANDHELDS

Journal Abstract Search


237 related items for PubMed ID: 20872650

  • 1. Incorporating linguistic, probabilistic, and possibilistic information in a risk-based approach for ranking contaminated sites.
    Zhang K, Achari G, Pei Y.
    Integr Environ Assess Manag; 2010 Oct; 6(4):711-24. PubMed ID: 20872650
    [Abstract] [Full Text] [Related]

  • 2. A combined Monte Carlo and possibilistic approach to uncertainty propagation in event tree analysis.
    Baraldi P, Zio E.
    Risk Anal; 2008 Oct; 28(5):1309-26. PubMed ID: 18631304
    [Abstract] [Full Text] [Related]

  • 3. A comparative approach for ranking contaminated sites based on the risk assessment paradigm using fuzzy PROMETHEE.
    Zhang K, Kluck C, Achari G.
    Environ Manage; 2009 Nov; 44(5):952-67. PubMed ID: 19763684
    [Abstract] [Full Text] [Related]

  • 4. Evaluation of remedial options for a benzene-contaminated site through a simulation-based fuzzy-MCDA approach.
    Yang AL, Huang GH, Qin XS, Fan YR.
    J Hazard Mater; 2012 Apr 30; 213-214():421-33. PubMed ID: 22390955
    [Abstract] [Full Text] [Related]

  • 5. Probability and possibility-based representations of uncertainty in fault tree analysis.
    Flage R, Baraldi P, Zio E, Aven T.
    Risk Anal; 2013 Jan 30; 33(1):121-33. PubMed ID: 22831561
    [Abstract] [Full Text] [Related]

  • 6. Marine and offshore safety assessment by incorporative risk modeling in a fuzzy-Bayesian network of an induced mass assignment paradigm.
    Eleye-Datubo AG, Wall A, Wang J.
    Risk Anal; 2008 Feb 30; 28(1):95-112. PubMed ID: 18304109
    [Abstract] [Full Text] [Related]

  • 7.
    ; . PubMed ID:
    [No Abstract] [Full Text] [Related]

  • 8. Uncertainty analysis based on probability bounds (p-box) approach in probabilistic safety assessment.
    Karanki DR, Kushwaha HS, Verma AK, Ajit S.
    Risk Anal; 2009 May 30; 29(5):662-75. PubMed ID: 19302279
    [Abstract] [Full Text] [Related]

  • 9. An integrated fuzzy-stochastic modeling approach for risk assessment of groundwater contamination.
    Li J, Huang GH, Zeng G, Maqsood I, Huang Y.
    J Environ Manage; 2007 Jan 30; 82(2):173-88. PubMed ID: 16574309
    [Abstract] [Full Text] [Related]

  • 10. Prioritizing groundwater remediation policies: a fuzzy compatibility analysis decision aid.
    Nasiri F, Huang G, Fuller N.
    J Environ Manage; 2007 Jan 30; 82(1):13-23. PubMed ID: 16516373
    [Abstract] [Full Text] [Related]

  • 11. Selection of remedial alternatives for mine sites: a multicriteria decision analysis approach.
    Betrie GD, Sadiq R, Morin KA, Tesfamariam S.
    J Environ Manage; 2013 Apr 15; 119():36-46. PubMed ID: 23454412
    [Abstract] [Full Text] [Related]

  • 12. Linguistic uncertainty in qualitative risk analysis and how to minimize it.
    Carey JM, Burgman MA.
    Ann N Y Acad Sci; 2008 Apr 15; 1128():13-7. PubMed ID: 18469210
    [Abstract] [Full Text] [Related]

  • 13. A comparison of numerical solutions of partial differential equations with probabilistic and possibilistic parameters for the quantification of uncertainty in subsurface solute transport.
    Zhang K, Achari G, Li H.
    J Contam Hydrol; 2009 Nov 03; 110(1-2):45-59. PubMed ID: 19796843
    [Abstract] [Full Text] [Related]

  • 14. Fuzzy-stochastic characterization of site uncertainty and variability in groundwater flow and contaminant transport through a heterogeneous aquifer.
    Zhang K, Li H, Achari G.
    J Contam Hydrol; 2009 Apr 15; 106(1-2):73-82. PubMed ID: 19217686
    [Abstract] [Full Text] [Related]

  • 15. A spatially-evaluated methodology for assessing risk to a population from contaminated land.
    Gay JR, Korre A.
    Environ Pollut; 2006 Jul 15; 142(2):227-34. PubMed ID: 16352380
    [Abstract] [Full Text] [Related]

  • 16. Representation, propagation, and decision issues in risk analysis under incomplete probabilistic information.
    Dubois D.
    Risk Anal; 2010 Mar 15; 30(3):361-8. PubMed ID: 20487395
    [Abstract] [Full Text] [Related]

  • 17. Integration of environmental and human health risk assessment for industries using hazardous materials: a quantitative multi criteria approach for environmental decision makers.
    Topuz E, Talinli I, Aydin E.
    Environ Int; 2011 Feb 15; 37(2):393-403. PubMed ID: 21111481
    [Abstract] [Full Text] [Related]

  • 18. Uncertainty characterization approaches for risk assessment of DBPs in drinking water: a review.
    Chowdhury S, Champagne P, McLellan PJ.
    J Environ Manage; 2009 Apr 15; 90(5):1680-91. PubMed ID: 19167150
    [Abstract] [Full Text] [Related]

  • 19. Combining the cost of reducing uncertainty with the selection of risk assessment models for remediation decision of site contamination.
    Chen YC, Ma HW.
    J Hazard Mater; 2007 Mar 06; 141(1):17-26. PubMed ID: 16926066
    [Abstract] [Full Text] [Related]

  • 20. An interval-based possibilistic programming method for waste management with cost minimization and environmental-impact abatement under uncertainty.
    Li YP, Huang GH.
    Sci Total Environ; 2010 Sep 15; 408(20):4296-308. PubMed ID: 20591470
    [Abstract] [Full Text] [Related]


    Page: [Next] [New Search]
    of 12.